1. Foundation
Piling system to Structural Engineer’s detail and/or design.
2. Superstructure
Reinforced concrete columns.
Reinforced/ Post tensioned concrete to beams and floor slabs.
3. Roof
Reinforced/ Post tensioned concrete flat roof with waterproofing.
4. Floor Loading
1st Storey Warehouse 7.5 kN/m2
1st Storey Mezzanine floor 3.0 kN/m2
2nd Storey to 10th Storey Production 5 kN/m2
Roof 0.75kN/m2 or M&E equipment loading
5. Floor to Floor Height
1st Storey (Warehouse Unit with Mezzanine floor) 7.2 metres approximately
2nd Storey to 10th Storey (Production Units) 4.0 metres approximately
6. External Walls
RC wall and/or clay brick wall and/or hollow block wall with skim coat and/or plaster with weathershield emulsion paint finish, where applicable.
7. Internal Walls
RC wall and/or clay brick wall and/or hollow block wall and/or precast panel wall with skim coat and/or plaster with emulsion paint finish, where applicable.
Homogenous tiles and/or granite tiles and/or plaster with emulsion paint finish, where applicable.
Homogenous and/or ceramic tiles finishes to toilet wall, where applicable.
8. Ceiling
Generally concrete ceiling soffit with skim coat and acrylic emulsion paint except lift lobbies, corridors, toilets with calcium silicate board suspended ceiling
9. Flooring
Generally power floated concrete floor to all areas except lift lobbies in homogenous and/or granite tile finishes and toilet areas in ceramic and/or homogenous tiles
10. Doors
Glass and/or timber doors and PSB’s approved fire-rated doors where applicable.
11. Locks
Good quality locksets and ironmongery.
12. Windows
Power-coated aluminium framed glass window system.
13. Electrical Installation
60Amps 3 Phase
#02-01, #02-02;
#03-01, #03-02
#04-01, #04-02
#05-01, #05-02
#06-01, #06-02
#07-01, #07-02
#08-01, #08-02
#09-01, #09-02
#10-01, #10-02
100Amps 3 Phase
#01-01;
Exit and Emergency lights in each unit
14. Sanitary Installation
Good quality sanitary wares and fittings in compliance with statutory requirements
15. Air-Conditioning and Mechanical Ventilation
Provision of mechanical ventilation to serve lift lobbies, toilets and carparks complied with authority requirements.
16. Lift
1 service lift
2 passenger lifts (direct access to all Units except #01-01)
17. Fire Protection System
Sprinkler and Fire Alarm System in compliance with statutory requirements
Dry Risers and Hose-reel System in common areas.
18. Lightning Protection
Lightning protection is provided to comply with latest code of practices.
19. Telecommunication Services
Cable tray from MDF room to telephone risers and common corridors.
Note:
Tiles: Selected tiles sizes and tile surface flatness cannot be perfect, and subject to acceptable range described in Singapore Standards SS483:2000.
Ventilation: Natural and/or mechanical ventilation as required by the Building and Construction Authority (BCA) and/or National Environment Authority (NEA).
Business Use: Light industrial development
The information contained herein is subject to change as may be approved by the relevant authorities and do not form part of an offer or contract. All art renderings and pictures herein are artist’s impression only and all areas stated herein are subject to re-survey. While every reasonable care has been taken in providing the information and specifications herein, neither the developer nor their appointed Marketing Agents can be held responsible for any inaccuracies.