1. Foundation
R.C Bored Piles
2. Superstructure
Reinforced concrete columns.
Reinforced/ Post tensioned concrete to all beams and floor slabs.
3. Roof
Reinforced/ Post tensioned concrete flat roof with waterproofing.
4. Floor Loading (to be confirmed)
1st Storey to 4th Storey (units area) 5 kN/m2
1st Storey to 4th Storey (driveway and landscape area) 5 kN/m2
5th Storey to 6th Storey 5 kN/m2
Roof 1.5kN/m2 or M&E equipment loading
5. Floor to Floor Height
1st Storey (Warehouse Units) 7.2 metres approximately
2nd Storey to 6th Storey (Factory Units) 6.0 metres approximately (Factory Units with Mezzanine)
6. External Walls
RC wall and/or clay brick wall and/or hollow block wall with skim coat and/or plaster with weathershield emulsion paint finish, where applicable.
7. Internal Walls
RC wall and/or clay brick wall and/or hollow block wall and/or precast panel wall with skim coat and/or plaster with emulsion paint finish, where applicable.
Homogenous tiles and/or granite tiles and/or plaster with emulsion paint finish, where applicable.
Homogenous and/or ceramic tiles finishes to toilet wall, where applicable.
8. Ceiling
Generally concrete ceiling soffit with skim coat and acrylic emulsion paint except lift lobbies, corridors, toilets with calcium silicate board suspended ceiling
9. Flooring
Generally power floated concrete floor to all areas except lift lobbies in homogenous and/or granite tile finishes and toilet areas in ceramic and/or homogenous tiles
10. Doors
Glass and/or timber doors and PSB’s approved fire-rated doors where applicable.
11. Locks
Good quality locksets and ironmongery.
12. Windows
Power-coated aluminium framed glass window system
13. Electrical Installation
60Amps 3 Phase
#01-01 to 07;
#02-01 to 07;
#03-01 to 07;
#04-01 to 07, #04-09 to 10;
#05-01 to 14;
#06-01 to 14;
100Amps 3 Phase
#04-08 (Ancillary Canteen);
14. Sanitary Installation
Good quality sanitary wares and fittings in compliance with statutory requirements
15. Air-Conditioning and Mechanical Ventilation
Provision of air-conditioning to selected lift lobbies, mechanical ventilation to serve lift lobbies and toilets complied with authority requirements.
16. Lift
1 service lift
1 passenger lift
17. Fire Protection System
Sprinkler and Fire Alarm System in compliance with statutory requirements
Dry Risers and Hose-reel System in common areas
18. Lightning Protection
Lightning protection is provided to comply with latest code of practices.
19. Telecommunication Services
Cable tray from MDF room to telephone risers and common corridors
20. Recreation Facilities
Swimming Pool
Note:
Tiles: Selected tiles sizes and tile surface flatness cannot be perfect, and subject to acceptable range described in Singapore Standards SS483:2000.
Ventilation: Natural and/or mechanical ventilation as required by the Building and construction Authority (BCA) and/or National Environment Authority (NEA).