FOUNDATION:
Reinforced concrete piles
SUPERSTRUCTURE:
Reinforced concrete frame structure
WALLS:
a) External Walls - Common bricks generally
b) Internal Walls - Common bricks generally
ROOF:
Concrete roof provided with approved insulation and approved waterproofing system
CEILING:
a) 'Vetonit' coating with emulsion paint to exposed reinforced concrete ceiling
b) Water-resistant gypsum fibre ceiling with emulsion paint to all Bathrooms
FINISHES:
a) Walls (Apartment)
Internal
i) Full height ceramic wall tiles up to ceiling for Kitchen except areas behind cabinets
ii) Full height conglomerate marble up to ceiling for Bathrooms
iii) Cement and sand plaster base with Wetonie finish to all rooms
b) Walls (Other Areas)
i) External : Sprayed textured coating on cement sand plaster
ii) Internal. : Sprayed textured coating on cement sand plaster for other typical lift lobbies & corridors; marble on 1st Storey Lift Lobby
c) Floor (Apartment)
i) Marble to Living and Dining Rooms
ii) Conglomerate marble to Bathrooms
iii) Timber parquet to Bedrooms
iv) Ceramic tiles to Kitchen, Yard, W.C. and Balcony
d) Floor (Common Areas) Internal
a) Marble to 1st Storey Lift Lobby
b) Homogeneous ceramic tiles to other typical lift lobbies & entrance/corridor to individual apartment
c) Slate to 1st Storey Entrance Lobby leading to 1st Storey Lift Lobby
WINDOWS:
Anodised aluminium framed windows and/or powder-coated aluminium framed windows
DOORS:
a) Main and side entrance - SISIR approved fire-rated decorative timber door
b) Decorative timber doors to Bedrooms, Kitchen and flush doors to other Rooms
c) Anodised aluminium framed doors to Living Room
d) Quality locksets 'Baldwin', `Showa' or equivalent approved by Architect
SANITARY FITTINGS:
a) Master Bathroom
— 1 water-closet, 1 vanity counter, 1 long bath, 1 paper holder & 2 soap holders
b) Bathrooms
(Type A A 1 A2 ) B B1 B2)
— 1 water-closet, 1 vanity counter, 1 long bath, 1 paper holder & 2 soap holders
Type C Cl C2
— 1 water-closet, 1 vanity counter, 1 paper holder, 1 soap holder & 1 shower tray
c) Bath (Yard)
— 1 water-closet, 1 wash basin, 1 paper holder & 1 soap holder
d) Kitchen
— 1 sink
AIR-CONDITIONING:
Split unit air-conditioning system in each apartment with individual remote control to Living/Dining Room and all Bedrooms
RECREATIONAL FACILITIES:
Swimming pool, Spa pool and Squash court
LIGHTNING PROTECTION:
Lightning protection system shall be provided in accordance with Singapore Standard CP
PAINTING:
Spray-textured coating externally Water-based acrylic emulsion paint to all internal walls
WATERPROOFING:
Waterproofing to Flat Roof, Bathrooms, Kitchen, Yard & Balcony
DRIVEWAY & CARPARK
a) Driveway - Interlocking concrete blocks
b) Carpark - Perforated interlocking paving blocks
KITCHEN CABINETS AND FITTINGS:
High & low-level timber kitchen cabinets with laminated finish, cooker hood, hob and oven
Description of Project: Proposed condominium housing development comprising a 20-storey block of flats (57 units) • Project Name: Balmoral Gate • Developer: Sino Development Pte Ltd (A member of Asia-wide Investment Group) • licence No.: B0003 • Tenure of Land: Freehold • Expected Date of TOP: 31st December 1995 • Expected Date of Legal Completion: 31st December 1999 • Location: Lots 19-2, 19-7, 19-8, 19-10, 19-11, 672 & 630 FS, 631 FS TS26 Bukit Timah Road/Balmoral Road • Building Plan No.: 1W 7265/90 • Project Manager: Asiawide Property Management Pte Ltd • Architects: Architects Studio as Principal Consultant in collaboration with Tangguanbee Architects • C & S Engineers: KKT Consultants, Kill Consultants Pte Ltd • M & E Engineers: Woo & Associates Pte Ltd • Quantity Surveyors: KPK Quantity Surveyors
The information contained in this website may be subject to changes as approved by the relevant authorities and cannot form part of an offer or contract. Illustrations in this website are the artist's impressions and are only to give an approximate idea of the project.