1. Foundation
Piled Foundation
2. Substructure & Superstructure
Reinforced Concrete Framework
3. Wall
External: Common clay bricks
Internal: Common clay bricks or cement blocks
4. Roof
Cover Roof-Metal deck roof
5. Ceiling
a) Basement lobby, Living, Dining, Master Bathroom, Bathrooms, Powder Room, Kitchen, Master Bedroom, Bedrooms, Yard
Skim coat or false ceiling with emulsion paint
b) Household Shelter & Private Car Park
Skim coat with emulsion paint
6. Finishes
a) Internal Wall
i) Basement Lobby, Living, Dining, Master Bedroom, Bedrooms, Kitchen, Yard, Private car park, Common/Private Staircases & Landings
Cement and sand plaster with emulsion paint
ii) Master Bathroom, Bathrooms & Powder Room
Imported ceramic tiles laid up to false ceiling height and on exposed surface only
iii) Household Shelter
Skim coat with emulsion paint
Note: No wall tiles behind mirrors. Wall surface above false ceiling will be left in its original bare condition
b) External Wall
Cement and sand plaster with textured coating or emulsion painting.
c) Floor
i) Basement Lobby
Imported ceramic tiles with skirting
ii) Living & Dining
Compressed marble tiles with skirting
iii) Bedrooms, Master Bedroom
Timber strips with timber skirting
iv) Powder Room, Master Bathroom, Bathrooms, Kitchen Yard, Household Shelter, Open Terrace, PES, Roof Terrace
Imported ceramic tiles
v) Common Staircase at Basement to 1st Storey Unit
Imported ceramic tiles with skirting
vi) Private Staircase
1st to Attic Storey and Landings
Timber strips with timber skirting
Basement to 1st Storey
Imported ceramic tiles with skirting
vii) Private Car Park
Concrete finish
viii) Planter & Air-con Ledge
Cement & Sand Screed
Note: Marble and granite are natural stone materials containing veins with tonality differences. There will be colour and marking caused by their complex mineral composition and incorporated impurities. While such material can be pre-selected before installation, this non-conformity cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation. However, granite being a much harder material than marble cannot be re-polished after installation. Hence some differences can be felt at the joint.
7. Windows
a) Living, Dining, Master Bedroom, Bedrooms, Master Bathroom, Bathrooms, Kitchen
Aluminium framed windows with or without fixed glass panel
Note:-
a) All aluminium frames shall be powder coated finish
b) All glazing shall be approximately 6mm thick
c) All windows are side hung, top hung, bottom hung or sliding or any combination of the above mentioned
d) All glazing below 1m shall be of tempered or laminated glass
8. Doors
a) Basement Main Entrance Door
Approved fire-rated timber door
b) 1st storey Main Entrance Door, Living and Dining
Aluminium framed glass door
c) Master Bedroom, Bedrooms, Master bathroom, Bathrooms, Powder room
Hollow core timber door
d) Yard, Roof Terrace & Open Terrace
Aluminium framed glass door
e) Household Shelter
Metal door as approved by relevant authority
f) Kitchen
Timber frame with glass sliding door
Note:-
a) All glazing shall be approximately 6mm thick
b) All aluminium frames shall be powder coated finish
c) Doors can either be of swing or sliding type with ot without fixed glass panel
9. Ironmongery
Basement/1st storey main entrance door and hollow core timber doors shall be provided with good quality imported lockset
10. Sanitary Fittings
a) Master Bathroom
-1 long bath with bath shower mixer/rose
-1 shower screen with shower mixer/rose
-1 vanity top complete with basin and mixer tap and shelf below
-1 water closet
-1 mirror
-1 paper holder
-1 towl rail
b) Bathrooms
-1 shower screen with shower mixer/rose
-1 vanity top complete with basin and mixer tap and shelf below
-1 water closet
-1 mirror
-1 towel rail
-1 paper holder
c) Powder Room (115E Jalan Kembangan)
-1 vanity top complete with basin, mixer tap and shelf below
-1 water closet
-1 mirror
-1 paper holder
-1 towel rail
d) Powder Room (115 to 115D Jalan Kembangan)
-1 vanity top complete with basin, mixer tap and shelf below
-1 water closet
-1 mirror
-1 paper holder
-1 towel rail
-1 shower with mixer/rose
e) Kitchen/Yard
-1 single lever sink mixer tap
-1 kitchen sink
11. Electrical Installation
a) Concealed electrical wiring in conduits
b) Refer to Electrical Schedule for details
12. TV/Telephone
Refer to electrical schedule for details
13. Lightning Protection
Lightning Protection System shall be provided in accordance with the Singapore Standard CP33.
14. Waterproofing
Waterproofing to floors of Powder Room, Master Bathroom, Bathrooms, Kitchen, Yard, Planter, Open Terrace and Roof Terrace
15. Recreational Facilities
a) Swimming Pool
16. TV System
SHCV TV points provided
17. Other Items
a) Wardrobes
Built-in wardrobes to all Bedrooms
b) Kitchen
Built-in high and low level kitchen cabinets with cooker hood, cooker hobs and built-in oven
c) Air-conditioning to Living, Dining and all Bedrooms
d) Hot Water Supply to all Bathrooms & Kitchen
e) Staircase railing
Basement to 1st Storey
Timber handrail
1st to Attic Storey
Glass parapet with timber handrail
Note:-
1. The brand and model of all equipment and appliances supplied will be provided subject to availability
2. Layout/Location of wardrobes, kitchen cabinets and fan coil units are subject to architect's sold discretion and final design
3. The air-conditioning system has to be maintained and cleaned on a regular basis by the Purchaser. That includes the cleaning of filters and clearing of condensate pipes to ensure good working condition of the system.
4. Connection, subscription and other fees for television, SHCV, Internet and other service providers whether chosen by the Purchaser or appointed by the Vendor or the management corporation when constituted will be paid by the Purchaser.
5. Equipment for SHCV will be paid and installed by Purchaser
6. Timber is a natural material containing grain and tonal differences Thus it is not possible to achieve total consistency of colour and grain in its selection and installation
7. Powder Room, Master Bath and bath 3 (115A to 115D Jalan Kembangan) are mechanically ventilated
Description of Common Property
Common Facility: Swimming Pool is to hold as common property as defined in the Building Maintenance and Strata Management Act 2004 and the Land Title (Strata) Act, Cap 158
Purpose of Building Project and Restrictions as to Use
The building project is strictly for residential occupation only
Private car parks are provided
The Open Terrace/PES are not to be enclosed or roofed over
Common Area
1. Management room is not provided