1. Foundation
Pile to engineer’s design.
2. Superstructure
Reinforced concrete structure to engineer’s specification.
3. Walls
a) External Walls : Reinforced concrete and/or common clay brick walls.
b) Internal Walls : Reinforced concrete and/or precast panels (light weight) and/ or dry wall panels and/or common clay brick walls.
4. Roof
Reinforced concrete flat roof.
5. Ceiling
For Apartments
a) Living/ Dining, Bedrooms Study : Skim coat and/or ceiling board with emulsion paint finish.
b) Bathrooms and Kitchen : Skim coat and/or water resistant ceiling board with emulsion paint finish.
c) Household Shelter : Skim coat with emulsion paint finish.
For Common Areas
a) Lift Lobbies : Skim coat and/or ceiling board with emulsion paint finish.
b) Carpark : Skim coat with emulsion paint finish.
c) Staircases : Skim coat with emulsion paint finish.
6. Finishes
Wall
For Apartments
a) Living/Dining, Bedrooms, Study, Household Shelter : Plaster and/or skim coat with emulsion paint finish.
b) Master Bath, Common Bathrooms : Ceramic tiles and/or homogenous tiles finish
c) Balcony : Plaster and/or skim coat with emulsion paint finish.
Note: No tiles/stone behind mirrors and above false ceiling.
For Common Areas
a) 1st Storey Lift Lobby : Ceramic tiles and/or stones and/or plaster with emulsion paint finish.
b) Typical Lift Lobbies, Corridors : Ceramic tiles and/or homogenous tiles and/or plaster and/or skim coat with emulsion paint finish.
c) Carpark and Ramps : Plaster and/or skim coat with emulsion paint finish.
d) Corridors : Plaster and/or skim coat with emulsion paint finish.
e) Staircases : Plaster and/or skim coat with emulsion paint finish.
Floor
For Apartments
a) Living/Dining : Compressed marble and/or ceramic tiles and/or homogenous tiles with timber and/or recessed PVC skirting finish.
b) Balcony : Ceramic tiles and/or homogenous tiles and/or stones tiles finish.
c) Kitchen : Compressed marble and/or ceramic tiles and/or homogenous tiles finish
d) Household Shelter : Ceramic tiles and/or homogenous tiles finish
e) Bathroom : Ceramic tiles and/or homogenous tiles and/or stones tiles finish.
f) Bedrooms, Study : Random teak strips flooring and/or compressed marble and/or ceramic tiles and/or homogenous tiles with timber and/or recessed PVC skirting finish.
g) Planter Boxes, A/C Ledges : Cement screed with paint finish.
For Common Areas
a) 1st Storey Lift Lobby : Ceramic tiles and/or homogenous tiles and/or stones tiles with skirting tiles finish.
b) Typical Lift Lobbies, Corridors : Ceramic tiles and/or homogenous tiles with skirting tiles finish.
c) Carpark and Ramps : Cement and sand screed finish.
d) Deck, Gymnasium, Walkway : Timber strip and/or ceramic tiles and/or stones tiles finish
e) Staircases : Cement and sand screed finish with nosing.
7. Windows
Powder coated aluminum framed with approximately 6 mm glass.
8. Doors
Aluminium with glass/acrylic or decorative timber or decorative timber with glass panel or glass panel. Steel door for house shelter as per requirement of authority. Quality imported locks brand.
9. Sanitary fittings
a) Master Bathroom
1 shower bath with shower mixer, rain-shower head and shower set.
1 basin and mixer tap
1 pedestal water closet
1 mirror
1 toilet paper holder
b) Common Bathroom
1 shower bath with shower mixer and shower set.
1 basin and mixer tap
1 pedestal water closet
1 mirror
1 toilet holder
10. Electrical Installation
All electrical wiring to be in concealed conduits and main in surface trunking/pipes. Where there is a false ceiling, the electrical wiring above false ceiling is in exposed conduits. Mechanical ventilation provided in bathroom (if required).
Refer to Electrical Schedule for details.
11. TV/Telephone
TV/telephone points shall be provided in accordance to the Electrical Schedule
12. Lightning Protection
Lightning protection system shall be provided in accordance with the current edition of Singapore Code of Practice.
13. Painting
a) Internal wall : Emulsion water-based paint.
b) External wall : Selected oil-based base coat and water-based exterior paint.
14. Water Proofing
Waterproofing to reinforced concrete flat roof and bathrooms (if any).
15. Driveway and Car Park
Concrete floor and/or ceramic and/or stone finish. The Mechanical Car Parking System has to be maintained regularly by the specialist to ensure that it is in good and proper working condition. The Vendor shall not be held responsible for the operation, procedure, delay, safety and damages caused with the use of the system
16. Recreation Facilities
The followings are provided:
a) Lap pool
b) Barbecue Pit
c) Gymnasium
d) Private lap pool at penthouse
17. Additional Items
a) Kitchen Cabinets
High and low kitchen cabinets with solid surface countertop complete with gas hob and cooker hood (ìBOSCHî brand or equivalent). One stainless steel sink complete with tap.
b) Wardrobes
Built-in wardrobes to all bedrooms (if any).
c) Air-Conditioning
Split type air conditioner (ìDAIKINî or equivalent) provided in living, dining, and bedrooms/ Study.
d) Water Heater
Heater of ìAristonî or equivalent.
e) Railing
Mild steel for common stair railing.
Steel and/or glass for other railings.
f) Security
Audio intercom to all units.
g) Lift
2 passenger lifts (KONE or equivalent) from first to fourteen floor.
h) Fencing
Brickwall and/or steel railing on brickwall.
Note:
1) Stone:
Stone is natural material containing veins with tonality differences. There will be colour and marking caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity cannot be totally avoided.
2) Timber:
Timber is a natural product that does not have total consistency of colour and grain. Thus it is not possible to achieve total consistency of colour and grain in their selection and installation.
3) Cable Television (SCV):
The purchaser is liable to pay annual fee, subscription fee and such other fees to Starhub Cable vision (SCV) or any other relevant authorities. The vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective subscription channels.
4) Internet:
The purchaser is liable to pay Assymmetrical Digital Subscriber Line (ADSL) connection, annual fee, subscription fee and such other fees to Internet service Provider (ISP). The vendor is not responsible to make arrangements with any said parties for the service connection for their respective subscription.
5) Air-conditioning:
Air-conditioning system has to be maintained and cleaned on a regular basis by the purchasers. This includes the cleaning of filters and condensation pipes to ensure good working condition of the system.
6) Wardrobe/Kitchen Cabinets, Mechanical Ventilation Units and Air-conditioning Fan Coil Units:
Layout/ location of wardrobe/kitchen cabinets, mechanical ventilation units (if any) and air-conditioning fan coil units (if any) are subjected to architect’s sole discretion and final design.
7) Household Shelter:
The Household Shelter is designed for use as civil defence shelter. The walls, ceiling, floor and door of the Household Shelter shall not be hacked, drilled, altered or removed
Whist every reasonable care has been taken in preparing this website, the developer and its agents cannot be held responsible for any inaccuracies. All statements are believed to be correct but are not to be regarded as statements of representation of facts. All information and specifications are current at the time of going to the press and are subjected to change as may be required and cannot form part of an offer or contract. All plans are subjected to any amendments approved or may be approved by the relevant authority. All art renderings and illustrations contained in this brochure are artist’s impressions only and photographs are only dÈcor suggestions and none can be regarded as representation of fact. Areas are approximate measurements and subject to final survey.