FOUNDATION
Pretensioned spun concrete piles.
SUPERSTRUCTURE
Reinforced concrete structure using Grade 35 complying with SS26 and steel reinforcement bar complying with SS2.
WALLS
Internal and External Wall — common clay bricks/or concrete blocks.
ROOF
a. Pitched Roof — Pitched unglazed roofing tiles with insulation.
b. Flat Roof — Reinforced concrete roof with appropriate insulation and waterproofing system.
CEILING
a. Apartment Ceiling Finishes
(i) Fibrous plaster ceiling with emulsion paint to private lift lobby, living, dining, family, bedrooms and storerooms.
(ii) Moisture-resistant fibrous plaster ceiling board with emulsion paint to bathrooms, kitchen, yard, powder rooms, terraces and balconies.
(iii) Skim coat with emulsion paint to all other areas in the apartment unit.
b. Common Area Ceiling Finishes
Moisture-resistant fibrous plaster ceiling and/or skim coat with emulsion paint.
WALL FINISHES
a. Apartment Wall Finishes
i) Cement and sand plaster with emulsion paint to private lift lobby, living, dining, family, bedrooms, utility, terraces, balconies and yard.
(ii) Polished marble and cement and sand plaster with emulsion paint to master bathroom.
(iii) Ceramic tiles and cement and sand plaster with emulsion paint to other bathrooms, powder room and yard toilet.
(iv) Ceramic tiles to kitchen (up to false ceiling height and exposed surface only) and part of yard.
b. Common Area Internal Wall Finishes
(i) Cement and sand plaster with emulsion paint.
(ii) Cement and sand plaster with selected textured coating and groove lines.
FLOOR FINISHES
a. Apartment Floor Finishes
(i) Marble to master bathroom and powder room.
(ii) Cement and sand screed to living, dining and family.
(iii) Timber strip with skirting to bedrooms (no timber strip below wardrobes).
(iv) Ceramic and homogeneous tiles to all other bathrooms.
(v) Ceramic tiles to kitchen, terraces and balconies.
(vi) Homogeneous tiles to private lift lobby.
b. Common Area Internal Floor Finishes
(i) Ceramic tiles to common lift lobby.
(ii) Cement and sand screed with ceramic nosing tiles to escape staircase.
(iii) Ceramic tiles with nosing tiles to escape staircase at basement only.
WINDOWS
a. Aluminium framed casement and fixed glass panel windows to bedrooms.
b. Aluminium framed casement and/or sliding windows to kitchen.
c. Aluminium Gained casement and/or top hung windows to bathrooms.
DOORS
a. Solid timber door to main entrance and yard door leading to common lobby.
b. Aluminium framed sliding doors with tinted glass to all balconies and upper penthouse terraces.
c. Timber veneer flush doors to bedrooms and bathrooms.
d. Timber veneer flush doors with viewing glass to kitchen
e. Timber door to storeroom.
f. Sliding aluminium door with obscure Perspex panel to maids bathroom.
g Locksets and ironmongery to all doors.
SANITARY FITTINGS
a. Master Bathroom
1 long bath complete with bath/shower mixer
1 shower compartment complete with shower mixer
Granite vanity top complete with 2 wash basins and mixer taps
1 pedestal water closet
1 toilet roll holder
2 soap holders
1 mirror
1 towel rail
b. Other Bathrooms
1 shower compartment complete with shower mixer
Granite vanity top complete with 1 wash basin and mixer tap
1 pedestal water closet
1 toilet roll holder
1 soap holder
1 mirror
1 towel rail
c. Powder Room
Granite vanity top complete with 1 wash basin and mixer tap
1 pedestal water closet
1 toilet roll holder
1 soap holder
1 mirror
1 towel ring
d. Yard Toilet
1 pedestal water closet
1 shower roint
1 toilet roll holder
1 soap holder
ELECTRICAL INSTALLATION
a. Lighting and power points provided with concealed wiring.
b. A11 electrical wiring will be in a concealed conduit. Where there is a false ceiling, the electrical wiring will be a surface-mounted conduit concealed in the ceiling space. Refer to Electrical Schedule for details.
TV/TELEPHONE POINTS
Adequate provision of TV/Telephone points.
All TV points are cable ready. Refer to Electrical Schedule for details.
LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with Singapore Standard CP33:1996.
PAINTING
Emulsion water-based paint to all internal wall.
Acrylic based with texture emulsion paint to external wall.
WATERPROOFING
Waterproofing to all bathrooms, kitchen, yard, kahony, penthouses roof terraces and concrete flat roof.
DRIVEWAY AND CAR PARK
a. Brick paving to surface driveways.
b. Concrete floor with hardener to basement car park.
RECREATION FACILITIES
a. Leisure pool of 240 sq m approximate surface area
b. Wading pool of 30 sq m approximate surface area
c. Lap pool of 180 sq m approximate surface area
d. Jacuzzi of 5 sq m approximate surface area
e. 1 Tennis court
f. Children's playground
g. Gymnasium room
h. Barbecue area
i. Male and female changing rooms with steam bath
j. Function room
k. Landscaped gardens with water features
ADDITIONAL ITEMS
a. Walk-in-wardrobe for the master bedroom.
b. Wardrobes for all bedrooms.
c. Upper and lower kitchen cabinets anti island counter complete with the cooking hob and hood.
d. Upper and lower kitchen cabinets at yard area complete with the cooking hob and hood.
e. Upper and lower kitchenette cabinets at bedsitter and upper penthouse family area.
f. Hot water supply will be provided to all bathrooms and kitchen except powder room, kitchenette, wet kitchen and maid's bathroom.
g. Split air-conditioning units to living, dining, family and bedrooms.
h. CCTV to be provided to basement service lift lobbies.
i. Audio-video intercom system to all apartments.
j. Proximity card access system will he provided at:
(i) Vehicular entries to main entrance to the development.
(ii) All pedestrian entrance gates to the development.
(iii) All private lift lobbies at basement.
k. Spa pool will he provided to all penthouses unit and located at roof terrace area.
Note: Marble are natural stone materials containing veins with tonality differences. There will he colour and markings on the marble caused by their complex mineral composition and incorporated impurities. Timber are natural materials containing grains and notches with tonality differences, While such materials can be pre-selected before installation, this non-conformity cannot be totally avoided.
