1. FOUNDATION
Pre-Cast concrete piles
2. SUBSTRUCTURE & SUPERSTRUCTURE
Reinforced concrete structure to engineer's specification
3. WALLS
a) Internal : Clay bricks
b) External : Clay bricks
4. ROOF
Flat roof : Reinforced concrete with appropriate waterproofing system
5. CEILING
a) Living/Dining & Bedrooms : False ceiling with decorative cornices.
b) Kitchen, bathrooms : False ceiling
c) Household shelter (HS) : Skim coat with emulsion paint
6. FINISHES
a) Walls (For Apartment)
Internal:
i) Master bathroom : Ceramic tiles laid up to ceiling height
ii) Common bathroom : Ceramic tiles laid up to ceiling height
iii) Kitchen : Ceramics tiles laid up to ceiling height
iv) Other areas : Cement and sand plaster/skim coat with emulsion paint
External:
v) Cement and sand plaster/skim coat with spray textured coating
b) Walls (For Common Areas)
Internal:
i) Lift Lobbies : Polished homogenous tiles
ii) Other areas : Cement and sand plaster/skim coat with emulsion paint
External:
iii) Cement and sand plaster/skim coat with spray textured coating
c) Floors (For Apartment)
i) Living/dining hall : Natural porous marble slabs with skirting
ii) Master bathroom : ceramics tiles
iii) Common bathroom : ceramics kble tiles
iv) Kitchen, HS, Yard : ceramics tiles
v) Bedrooms : Teak parquet flooring with skirting
d) Floors (For Common Area)
i) Lift lobbies : Homogeneous tiles
ii) Staircases : Homogeneous tiles
iii) Other areas : Cement/sand screed or ceramics tiles
7. WINDOWS
upvc/ aluminium framed glass windows
8. DOORS
a) Main Entrance : Approved fired-rated timber door with veneer finish
b) Bedrooms & Bathrooms : Timber door with veneer finish
c) Kitchen : Timber door with veneer finish and glass viewing panel
d) HS : Light steel protective door according to Competent Authority's requirement
9. SANITARY FITTINGS
a) Master Bathroom
- One long bath with bath mixer
- One shower screen with shower mixer
- Marble/Granite vanity top complete with one wash basin and one tap mixer
- One pedestal water closet
- One mirror
- One soap holder
- One toilet paper holder
- One towel rail b)Common Toilet
- One shower screen with shower mixer
- Marble/Granite vanity top complete with one wash basin and one tap mixer
- One pedestal water closet
- One mirror
- One soap holder
- One toilet paper holder
- One towel rail
10. ELECTRICAL INSTALLATION
a) Ample electrical points will be provided
b) TV/Telephone outlets will be provided for living/dining areas and all bedrooms
11. LIGHTNING PROTECTION
Lightning protection system provided in accordance to local codes
12. PAINTING
a) Internal walls : Emulsion paint
b) External walls : Emulsion paint with spray textured coating
13. WATERPROOFING
To kitchen floor, bathroom, yard area, roof terrace and reinforced concrete flat roof
14. DRIVEWAY & CARPARK
Homogeneous tiles or cement/sand screed to driveways and carparks. Total no of parking lots: 24
15. RECREATIONAL FACILITIES
a) Swimming pool
b) BBQ area
16. ADDITIONAL
a) Kitchen cabinet without utensils
b) Cooker hood/hob
c) Air-conditioning to living/dining and bedrooms
d) Auto-gate system
e) Audio intercom provided to each apartment. Audio intercom system linked to main gate.
f) Complimentary 12 months subscription to SCV MaxTV* (Cable TV) and SCV MaxOnline (Broadband Internet access).
* 4 Basic Groups (World News, Education. Entertainment, Kids). Sports and Disney Channel. Terms and conditions apply.
NOTE:
a) Marbles and granite are natural stone materials containing veins with varying tonality and colour due to their complex mineral composition and inherent impurities. Similarly, timber, being a natural product does not have total consistency of colour and grain. Whilst these materials will be pre-selected before installation, non-uniformity between pieces cannot be avoided.
b) The purchasers shall, if required by the Singapore Cable Vision Limited or any other relevant authority, pay the subscription fee, annual maintenance fee. and monthly charges to Singapore Cable Vision Limited or another any other relevant authority.
c) While every reasonable care has been taken in preparing this website, the developer and its agents cannot be held responsible for any inaccuracies. All statements are believed to be correct but are not to be registered as statements or representations of facts. All information and specifications are current at the time of going to press and are subject to change as may be required and cannot form part of the contract. All plans are subject to any amendments approved by the relevant authority. Renderings and illustrations are artist's impressions only and cannot be regarded as representation of fact. Floor areas are approximate measurements and are subject to final survey.