FOUNDATION
Precast reinforced concrete piles - Grade 41
SUPERSTRUCTURE
a) Reinforced concrete using Grade 30 concrete complying with BS 8110.
b) Steel reinforcement bars complying with BS4449/Welded steel fabric reinforcement complying 8532.
WALLS
a) External: Reinforced concrete walls/columns and clay brickwalls infill.
b) Internal: Reinforced concrete walls/columns and clay brickwalls/aerated concrete block infill.
ROOF
a) Pitched roof: Metal trellis feature and clay roof tiles.
b) Flat rooft: Reinforced concrete flat roof with waterproofing membrane and insulation.
CEILING
a) Fibrous plasterboard ceiling to kitchens and bathrooms.
b) Cement plaster and paint on concrete ceiling to other parts of the apartment.
c) Fibrous plaster board ceiling to all units on 10th storey.
FINISHES
a) Walls
i) Internal Walls:
Cement plaster/skim coat and paint to living. dining, bedrooms, utility. yard, corridor and store.
Ceramic tiles to false ceiling height to exposed areas of kitchen, bathrooms and we.. Marble to false ceiling height to exposed areas of bathroom 1.
ii) External Walls:
Cement and sand plaster, with textured coating and painted.
b) Floor
i) Internal Floor Finishes:
Marble to living, dining and bathroom 1.
Laminated floorboard in timber grain finish to bedrooms.
Ceramic tiles to store, yard, utility, w.c., balcony, kitchen and bathrooms.
ii) External Floor Finishes:
Granite/Marble to 1st storey and basement lift lobby.
Homogeneous tiles to other lift lobbies.
Concrete with hardener to basement carpark.
WINDOWS
a) Fluorocarbon aluminium framed casement/top hung windows to living, bedrooms, bathrooms, utility, kitchen and w.c.
b) Glass-tinted float glass generally. Obscure glass for bathrooms and w.c.
DOORS
a) Solid timber door to main entrance door and kitchen door leading to lift lobby. Timber flush doors to bedrooms, bathrooms, utility, store, w.c. Timber flush doors with glass - panel to kitchen door leading to dining area.
b) Fluorocarbon aluminium framed sliding doors for living with balcony. Glass - tinted float glass.
c) Fluorocarbon aluminium framed swing door for kitchen door leading to yard. Glass - tinted float glass.
d) Locks - any of the following brands - Hafelle, Schlage, Harloc, LT, Showa, Delta, Master Lock & Weiser.
SANITARY FITTINGS
a) Type A1, A1a, A2, A2a, A3, A3a.
Type B1, C1, C1a, C2, C2a.
Bath 1
1 long bath, 1 water closet, 1 vanity basin, 1 towel rail, 1 soap holder and 1 toilet paper holder.
b) Type C3, C3a, D1 D2, D3. E1 and E1a.
Bath 1
1 long bath, 1 water closet, 1 vanity basin, 1 towel rail, I soap holder, 1 toilet paper holder and I shower area with shower screen and door.
c) Type B1, C1, C1a, C2, C2a, C3, C3a, D1, D2, D3, E1 and E1a.
Bath 2
1 shower area, 1 water closet, 1, vanity basin, 1 towel rail. 1 soap holder and 1 toilet paper holder.
d) Type E1 and E1a.
Bath 3
1 shower area, 1 water closet, 1 vanity basin, 1 towel rail, 1 soap holder and 1 toilet paper holder.
e) Type B1, C1, C1a, C2, C2a, C3, C3a, D1, D2, D3, E1 and E1a. W.C.
1 wall hung basin, 1 water closet, 1 toilet paper holder. 1 shower point and 1 bib tap.
f) Kitchen
1 sink.
Concealed electrical wiring in cast-in conduit. Electrical wiring in exposed conduit at areas with false ceiling
TV/FM/ TELEPHONE
1 TV/FM point at living and all bedrooms, 1 telephone point at living and all bedrooms.
LIGHTING PROTECTION
All apartments blocks are provided with lightning protection system which has been designed in accordance with Singapore Standard CP33:1985.
PAINTING
Internal Walls - emulsion paint.
External Walls - generally texture paint coating.
WATERPROOFING
Waterproofing to basement floor and wall, r.c. flat roof. 1st storey garden deck, planter boxes, bathroom, yard. kitchen. w.c. and balcony floor.
DRIVEWAY AND CARPARK
Entrance paving feature of granite slabs and homogeneous tiles.
Driveway of concrete interlocking pavers with aggregate finish.
Concrete floor with hardener to basement.
RECREATION FACILITIES
a) Swimming pool.
b) Children's wading pool with children play features/jets.
c) Spa/Jacuzzi.
d) Tennis court.
e) Clubhouse with: squash court, multi-purpose room, pool terrace, gymnasium room, male and female saunas, management office and changing rooms.
f) Children's playground.
g) BBQ areas.
h) Water features - mist garden with pond.
ADDITIONAL ITEMS
a) Kitchen cabinets - high and low kitchen cabinets with laminated finish and polyester acrylic component counter top.
b) Bedrootn wardrobes - built-in wardrobes with laminated finish.
c) Appliances - a cooker hob, a cooker hood, built-in oven to kitchen. Storage water heater with hot water supply pipework to bathrooms and kitchen.
d) Air-conditioners - wall hung split air-conditioning system is provided to all bedrooms, living and dining rooms.
e) Audio Intercom System to unit.
f) CCTV at main lift lobby and strategic areas.
g) Card access vehicle bather at main entrance.
h) Town gas.
CONSULTANTS
Architect : Akitck Regional
Design Consultant: Smallwood, Reynolds,Stewart. Stewart & Assoc. Pte. Ltd.
Structural Engineer: Richard K C Lim & Partners
M & E Engineer : Alpha Engineering Consultants
Quantity Surveyor : Davis Langdon & Seah (S) Pte. Ltd.
Landscape Architect : Ecoplan Landscape Architects & Planners
Interior Designer : J C Will & Associates Pte. Ltd.
PROJECT DETAILS
Developer : City Developments Ltd
Tenure of Land : Freehold
Lot : 240-1
Mukim : 10
Planning Approval No. : DC 9511184 - 1(070895-16111-M)
Building Plan Approval No. : BP 2515/95
Developer's Licence No. :130885
Expected TOP Date : 31st March 1999
Date of Legal Completion : 31st March 2003