Chiverton is a boutique development located at 50 Ewe Boon Road in the prime District 10 of Singapore. The development is a unique blend of modernity and tradition, featuring stylish architectural design and premium facilities while also showcasing the rich history and culture of the surrounding area.
The development was completed in 2003, comprising a single block of 15 residential units. The units range from three-bedroom apartments to spacious penthouses, with a floor area of 1,292 square feet to 2,110 square feet. Each unit is designed with the utmost care to maximize space, natural light and privacy, ensuring residents enjoy a comfortable and serene living environment.
One of the unique features of Chiverton is its location in the heart of District 10, one of the most sought-after areas in Singapore. The development is surrounded by some of the city’s top schools, including the Singapore Chinese Girls’ School and the Anglo-Chinese School. It is also close to Orchard Road, one of Singapore’s most popular shopping destinations, and is easily accessible via major highways and public transport.
Amenities
Chiverton’s 15 exclusive apartment units are well-served by:
• two lifts serving each unit – Common lift and private ‘Bubble’ lift
• Full privacy – only one unit per floor
• 2nd 15th floors: option of Jacuzzi, study area or extension of living room
• Penthouse is equipped with a rooftop Jacuzzi and rooftop garden
• Beautiful landscaping & water feature
• Children’s playground
• Outdoor exercise station
• Broadband and Internet-enabled
Chiverton Location Map
Chiverton Street View
Chiverton Resale/Rental Prices
Site Map & Floor Plans
Chiverton Unit Distribution Chart
Unit No.
No. Of Rooms
Area (sqft)
#02-01
3 + Flexi Options
1292
#03-01
3 + Flexi Options
1292
#04-01
3 + Flexi Options
1292
#05-01
3 + Flexi Options
1292
#06-01
3 + Flexi Options
1292
#07-01
3 + Flexi Options
1292
#08-01
3 + Flexi Options
1292
#09-01
3 + Flexi Options
1292
#10-01
3 + Flexi Options
1292
#11-01
3 + Flexi Options
1292
#12-01
3 + Flexi Options
1292
#13-01
3 + Flexi Options
1292
#14-01
3 + Flexi Options
1292
#15-01
3 + Flexi Options
1292
#16-01
Penthouse
2110
Chiverton 2nd to 15th Storey (Option 1, 2 and 3) Floor Plan
Chiverton 2nd to 15th Storey (Option 4 and 5) Floor Plan
Chiverton 16th Storey Floor Plan
Specifications
FOUNDATION
Bored Piles
SUPERSTRUCTURE
Reinforced concrete structure using Grade 35 concrete.
WALLS
External Wall: common bricks with plastering
Internal Walls: common bricks with plastering
ROOFS
Reinforced concrete flat roof with approved thermal insulation and waterproofing system.
CEILING
Water-resistant gypsum fibrous plasterboard to kitchen and bathrooms. Cement / sand plaster and paint to soffit to rc slabs to other areas.
FINISHES
a)Wall :
1) Internal Wall Full height marble finish at Bathrooms. Full-height ceramic tiles to false ceiling at kitchen and WC. Cement / sand plaster and paint at other areas.
2) External Wall Cement I sand plaster with algae-resistant paint
b)Floor :
Marble flooring at the Living, Dining and Bathrooms. Ceramic floor tiles at kitchen, utility, WC and yard. Teak strip flooring at bedrooms.
WINDOWS
Aluminium casement windows, adjustable louvre windows and top-hung windows with float glass.
DOORS
Main Entrance & Staircase: solid timber door.
Bedroom: timber panel door.
Kitchen: timber panel door with fixed glass panel.
Bathroom & Utility: timber flush door with lamination.
SANITARY FITTINGS
Quality sanitary wares and fittings to be provided.
ELECTRICAL INSTALLATION
ELECTRICAL SCHEDULE
Electrical Provisions
2nd to 15th Storey
16th Storey
Lighting Point
15
22
13A Switch Socket Outlet
25
28
Telephone Outlet
5
5
SCV Outlet
5
5
Water Heater Point
2
2
13A Washing Machine Outlet
1
1
Door Bell Point
1
1
Cooker Point
1
1
Oven Point
1
1
Kitchen Hood Point
1
1
Air-Conditioning Isolator
4
4
Jacuzzi Isolator
1
1
Distribution Board
2
2
Audio/Video Intercom
1
1
TV/FM/TELEPHONE
Refer to Electrical Schedule.
LIGHTNING PROTECTION
Lightning protection system shall be provided in accordance with Singapore Standard CP 33 1996.
WATERPROOFING
Waterproofing will be provided to bathroom, kitchen, rc flat roofs and planter boxes
DRIVEWAY / CARPARK
Interlocking paver to driveway, handicapped carpark lot and carpark lots beneath building and perforated slab to open surface carpark. lots.
RECREATION FACILITIES
Where provided, specify as follows:-
a) 2 nos. of lift serving 1St to 16"' storey including one no. private lift.
b) Ample carpark lots.
ADDITIONAL ITEMS
Where provided specify as follows :-
a) Kitchen Cabinets
b) Air-Conditioning (Multi-split system) to living/dining and bedrooms
c) Hot water supply to bathrooms
d) Audio / Video Intercom provided to each apartment
e) Proximity Card Access System
f) Concealed conduit for home IT network system (system and wiring not included).
Own your dream property stress-free. We go beyond real estate. Our interior design-trained realtors provide a one-stop shop for all your property needs: buying, selling, renting, and everything in between. We will help you with financing and tax planning, investment analysis and portfolio management, timeline planning and space optimization and even interior design assistance before renting or purchasing the property. Get a free consultation today and let our professionals guide you every step of the way.
Reviews
There are no reviews yet.