1. FOUNDATION : Piling system to engineer’s specification / BCA’s approval.
2. STRUCTURE : Reinforced concrete to engineer’s design.
3. ROOF : Reinforced concrete flat roof with waterproofing and insulation
4. FINISHES :
Wall (Common Areas)
External : Plastered reinforced concrete with spray textured coating and/or weather proof low VOC paint
Internal : Pre-cast panels and/or brick wall with emulsion low VOC paint
1st Storey Lift Lobby : Granite tiles up to false ceiling (exposed areas only)
Typical Lift lobbies : Brick wall with emulsion low VOC paint.
Staircases : Brick wall with emulsion low VOC paint and/or skim coat
Wall (Apartments)
Living / Dining / Bedrooms / Study / and/or Household Shelter: Brick wall with emulsion low VOC paint and/or skim coat
Master Bath / Toilet and Kitchen : Ceramic tiles laid up to false ceiling (exposed areas only)
Ceiling (Common Areas)
Sky Terrace / Pool Deck : Cement with skim coat and/or plaster boards with emulsion paint
Barrier Free Toilet : Moisture resistant plaster boards with emulsion paint
Gymnasium : Plaster boards with emulsion paint
Ceiling (Apartments)
Living / Dining / Balcony / AC Ledge : Cement with skim coat and/or plaster boards Household Shelter with emulsion paint
Bedrooms / Study : Plaster boards with emulsion paint
Toilet and Bath / Kitchen : Moisture resistant plaster boards with emulsion paint.
Floor (Common Areas)
1st Storey Lift Lobby : Granite slab and/or homogeneous travertine tiles
Typical Lift Lobbies : Homogeneous travertine tiles
Staircases : Homogeneous tiles for 1st storey up to 2nd and basement storey only and Cement rendering with homogeneous nosing tiles for the rest of the storeys
Pool Deck : Timber deck and/or homogeneous tiles
Sky Terrace : Timber deck and/or granite and/or homogeneous tiles and/or carpet grass and top soil
Swimming Pool / Jacuzzi : Mosaic tiles
Walkway / Handicap Ramp : Smooth cement finish and/or homogeneous and/or concrete imprint
Driveway / Car park : Smooth cement finish and/or concrete imprint and/or interlocking concrete pavers
Floor (Apartments)
Living / Dining / Kitchen : Compressed marble and/or marble tiles with similar skirting
Bedroom / Study : Compressed marble and/or marble tiles with similar skirting
Floor (Apartments)
Master Bath/ Common Toilet : Homogeneous tiles
Household Shelter : Homogeneous with similar skirting
Planter box and A/C Ledge : Smooth cement finish
Balcony : Homogeneous tiles
5. WINDOW : Powder coated aluminum framing with min. 6mm thick clear/tinted glass.
6. DOORS :
Main Entrance : Fire-rated laminated timber door
Bedrooms/Bathrooms : Hollow core veneered timber door
Household Shelter : PSB approved blast door
Balcony : Powder coated aluminum framing with min. 6mm thick tempered clear/tinted glass
Ironmongery : Locksets and hinges to Architect’s selection
7. RAILINGS : Laminated tempered glass with stainless steel capping and/or mild steel with paint to Architect’s selection
8. SANITARY WARES AND FITTINGS:
-Main / Common Toilet and Bath
1 shower cubicle complete with shower mixer (rain shower system for main toilet and bath only)
1 shower set and soap dish
1 basin and mixer tap with cabinetry below
1 water closet
1 mirror
1 towel rod
1 toilet paper holder
9. LIGHTNING PROTECTION SYSTEM: Lighting Protection System shall be provided in accordance with Singapore Standard CP33 1996.
10. WATERPROOFING : Waterproofing is provided to floors of bathrooms, kitchens, R.C. ledges, A/C ledges, roof, planter boxes and
where required.
11. RECREATIONAL FACILITIES :
Indoor Gym
Outdoor Gym
Swimming Pool
Children Play Pool
BBQ area
Jacuzzis
Outdoor Fitness Area
12. ADDITIONAL ITEMS :
Kitchen Cabinets : High and low kitchen cabinets with solid surface worktop complete with single bowl sink and mixer
Kitchen Appliances : Bosch electric cooker hob and cooker hood
Wardrobes : Built-in wardrobes (bedrooms only)
Air-conditioning : Daikin/Mitsubishi inverter multi-split type air-conditioning units to living / dining and bedrooms
Video Intercom System : Fermax / Aiphone video intercom to units
Electric Water Heater : Hot water supply to all bathrooms (except W.C.), kitchen and where applicable
Soil Treatment : Anti-termite chemical soil treatment by specialist (subject to approval by the relevant authorities)
NOTE:
1) Floorings:
Granite and marble are natural materials containing veins and tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation. However, granite being a much harder material than marble cannot be re-polished after installation. Hence, some differences may be felt at the joints. Timbers are natural material containing veins and tonal differences. Thus, it is not possible to achieve total consistency of colours and grain in their selection and installation. The tonality and pattern of the flooring materials selected and installed shall be subject to availability
2) Warranties:
Where warranties are given by the manufacturers and/or contractors and/or suppliers of any of the equipment and or appliances installed by the Vendor at the Unit/Building, the Vendor shall assign to the Purchaser such warranties at the time when possession of the Unit/Building is delivered to the Purchaser.
3) Cable Television:
The Purchaser is liable to pay annual fee, subscription fee and such other fees to the StarHub Cable Vision Ltd (SCV) or any other relevant party or any other relevant authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective subscription channels.
4)Layout:
Location of wardrobes, kitchen cabinets, fan coil units, electrical points, door swing positions and plaster ceiling boards are subjected to Architect’s sole discretion and final design.
5) Air Conditioning:
Regular maintenance by the Purchaser of the air-conditioning systems, including the clearing of filters and condensation pipes, is essential for the efficient running and prolonging their operating life.
6) Internet Access:
If the Purchaser requires internet access, the Purchaser will have to make direct arrangements with an Internet Service Provider and/or such relevant entities/authorities for internet service to the Unit and make all necessary payments to such Internet Service Provider and/or such relevant authorities.