CT Foodchain, A Food Production Factory At Pandan Loop
In Singapore, consumer appetites are healthy and food manufacturing is flourishing. The world trusts our food and is hungry for more.
CT Foochain is a rare opportunity for food businesses to build enduring success. As a brand-new B2 Food Industrial development in the mature Pandan Food Zone with a 64-year lease, it is an investment in the future and the start of a lasting legacy.
As A Fine Food Distributor, It’s Essential That You Maintain The Freshness, Quality And Value Of Your Globally-Sourced Products
CT Foodchain supports top-of-the line cold room facilities so your products are stored in the right temperature controlled environment. There are also separate lifts for raw and cooked food to keep cross-contamination at bay.
As a next-Generation Family Business Leader, You Want To Make Your Mark
Take a traditional business into the future by staying true to your heritage and embracing modernisation. CT FoodChain offers a firm foundation for your business to go global, while the Singapore brand, known for food safety and quality, paves the way.
As A Food Service Operator, You Want To Achieve Manpower-Lean Operations With An Efficient Central Kitchen.
Drive productivity and lower costs without compromising on taste and quality. CT Foodchain is designed to support large-scale central kitchen operations, with the potential for incorporating automation and technology.
As A Foodpreneur, Innovation Is The Lifeline Of Your Business
Whether you are testing new food concepts or experimenting with food technology, it pays to stay connected to the industry. Plug into the mature Pandan Food Zone with a brand-new business space that is flexible, modular, and made for your needs.
CT Foodchain Location Map
CT Foodchain Street View
CT Foodchain Resale/Rental Prices
Site Map & Floor Plans
CT Foodchain Cross Sectional View
CT Foodchain Grand Mezzanine 1st Storey Floor PlansÂ
CT Foodchain 2nd Storey Floor Plans
CT Foodchain 3rd Storey Floor Plans
CT Foodchain 4th/5th Storey Floor Plans
CT Foodchain 6th/7th Storey Floor Plans
CT Foodchain 8th/9th Storey Floor Plans
CT Foodchain 10th Storey Floor Plans
Videos & Virtual Tour
CT FoodchainFlythrough Animation
CT Foodchain Cloud Kitchen
Specifications
FOUNDATION Reinforce concrete piling and/or substructure to Structural Engineer's detail and/or design.
ROOF Reinforced concrete flat roof with waterproofing and insulation and/or metal roof with insulation at designated areas.
CEILING Concrete off form finish and/or skim coat and emulsion paint finish and/or false ceiling with paint finish, where applicable.
Estimated Floor to Floor Height: 1St Storey 6.825m 2nd to 4th 6.825m 5th to 9th Storey 5.075m 10th Storey 7.000m
FINISHES Walls i) Common Areas: Cement and sand plastering and/or skim coat with emulsion paint finish and/or spray-textured finish and/or ceramic tiles where applicable ii) Units: Cement and sand plastering and/or skim coat with emulsion paint finish and/or ceramic tiles to toilet and bin rooms and refuse chamber up to ceiling height
Note: No tiles and/or plaster and/or skim coat with emulsion paint above false ceiling
Floors i) Lift Lobbies: Floor tiles and/or power float concrete floor ii) Units: Power float concrete floor with hardener and/or floor tiles with waterproofing where applicable iii) M&E Rooms: Cement and sand screed finish with waterproofing where applicable and/or power float concrete with hardener iv) Driveway: Power float concrete with hardener and/or bitumen premix and/or concrete imprint v) Toilets/Refuse Bin Centre: Floor tiles with waterproofing where applicable vi) Staircases: Cement and sand screed finish with nosing strip and/or metal plate with paint and/or natural finish
DOORS Metal and/or aluminium and/or timber doors and/or metal roller shutters and/or PVC doors where applicable.
PLUMBING AND SANITARY (a) Plumbing and sanitary installation are provided in accordance with statutory requirements. (b) Scupper drain and sampling sump provided for each unit in accordance with statutory requirements
ELECTRICAL SUPPLY 1st Storey Units 125 Amp (3 Phase) 2nd-4th Storey Units 125 Amp (3 Phase) 5th-9th Storey Units 100 Amp (3 Phase) 10th Storey Units 125 Amp (3 Phase)
LIGHTNING PROTECTION Lightning protection system provided in accordance with prevailing code of practice.
PAINTING Weather-resistant paint and/or spray-textured finish to the external and emulsion paint/acrylic paint to the internal surfaces where applicable.
WATERPROOFING Waterproofing provided to all slabs subjected to water penetration, internal wet areas (e.g. toilets and bin centres), slabs above water-sensitive areas (e.g. substations) and areas open to sky where applicable.
MECHANICAL VENTILATION Natural/Mechanical ventilation shall be provided in compliance with authority requirement to the designated areas.
LIFTS 2 (two) nos. of passenger lifts and 2 (two) nos. of service lifts.
FIRE PROTECTION Fire Protection System provided in accordance with statutory requirements.
FLOOR LOADING All Driveway/ Ramp/ Loading and Unloading Area 10 kN/m2 1St Storey Units 15 kN/m2 2nd Storey to 4th Storey Units 12.5 kN/m2 5th Storey to 9th Storey Units 10 kN/m2 10th Storey Units 12.5 kN/m2 1st Storey to 3rd Storey Mezzanine 4 kN/m2
TELECOMMUNICATION Common cable trays for telecom cables are provided on each floor.
GAS SUPPLY Supply of gas (LPG) through pipeline network from the centralised cylinder bank to each unit with cap off at unit entrance.
WASTE DISPOSAL SYSTEM Refuse chute provided are every unit at 2nd storey to 10th storey and 1 (one) designated bin point for each unit on the 1st storey.
EXHAUST DUCT Dedicated exhaust duct from each unit to roof with cap off for purchaser's connection at high level.
LOADING BAY & AREA 1 (one) number of 7.5m rigid frame vehicle loading and unloading bay at 1st storey and loading and unloading area in front of each unit.
NOTES TO SPECIFICATIONS A. Materials, Fittings, Equipment, Finishes, Installations and Appliances Subject to clause 15.3, the brand, colour and model as specified for all materials, fittings, equipment, finishes, installations and appliances to be supplied shall be provided subject to the Architect's selection and market availability.
B. Warranties Where warranties are given by the manufacturers and/or contractors and/or suppliers of any of the equipment and/or appliances installed by the Vendor at the Unit, the Vendor will assign to the Purchaser such warranties at the time when vacant possession of the Unit is delivered to the Purchaser. Notwithstanding this assignment, the Vendor shall remain fully responsible for the performance of its obligations under clauses 10 and 18.
C. False Ceiling The false ceiling space provision allows for the optimal function and installation of IV8zE services. Access panels are allocated for ease of maintenance access to concealed M&E equipment for regular cleaning purposes. Where removal of equipment is needed, ceiling works will be required. Location of false ceiling is subject to the Architect's sole discretion and final design.
D. Glass Glass is manufactured material that is not 100% pure. Invisible nickel sulphide impurities may cause spontaneous glass breakage, which may occur in all glass by all manufacturers. The Purchaser is recommended to take up property insurance covering glass breakage to cover this possible event. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clauses 10 and 18.
E. Mechanical Ventilation System Mechanical ventilation fans and ductings are provided to fire fighting lobby, unit toilets and bin room, and localized area of production unit, car parks and driveways which are not naturally ventilated. To ensure good working condition of the mechanical ventilation system, the mechanical ventilation system for the exhaust system within internal toilets, units, bin rooms (where applicable) is to be maintained by the Purchaser on a regular basis.
F. Wall All wall finishes shall be terminated at false ceiling level. There will be no tiles/stone works behind kitchen cabinets/vanity cabinet/mirror.
G. Tiles Selected tile sizes and tile surface flatness cannot be perfect, and subject to acceptable range described in Singapore Standards SS483:2000.
H. Exhaust Duct Exhaust ducts are provided to all Units, to comply with statutory requirements. Wet chemical suppression system, exhaust fans, hood, fresh air fans and air cleaner as well as accessories are to be provided by Purchaser connecting to Vendor provided exhaust duct to comply with NEA requirements. To ensure good performance of the exhaust system, maintenance for respective unit exhaust system and its exhaust duct from internal to external of the unit shall be done by the Purchaser.
I. Water and/or LPG and/or Electrical Supplies The Purchaser is liable to pay such fees to the water and/or LPG and/or electrical supply providers or any other relevant party or any other relevant authorities for the supply connection for their respective water and/or LPG and/or electricity supply. The Vendor is not responsible for making arrangements with any of the said parties.
E-Brochure
CT Foodchain E-Brochure
Reviews
There are no reviews yet.
Be the first to review “CT Foodchain” Cancel reply
Chat With Us Today!
Own your dream property stress-free. We go beyond real estate. Our interior design-trained realtors provide a one-stop shop for all your property needs: buying, selling, renting, and everything in between. We will help you with financing and tax planning, investment analysis and portfolio management, timeline planning and space optimization and even interior design assistance before renting or purchasing the property. Get a free consultation today and let our professionals guide you every step of the way.
Reviews
There are no reviews yet.