1. Foundation
Piled Foundation
2. Substructure & Superstructure
Reinforced Concrete Framework
3. Wall
External: Common day bricks
Internal: Common clay bricks or cement blocks and/or dry wall
4. Roof
Flat Roof: Reinforced concrete roof with waterproofing system
Pitch Roof: Metal root
5. Ceiling (For Apartments)
a) Living/Dining, Master Bedroom, Bedrooms, Study, Kitchen, Service Counter (Iype C2-P only)
Master Bathroom Bathrooms. WC and Yard
Skim coat or false ceiling with emulsion point
b) Household shelter. PES Planter, AC Legge and Balcony
Skim coat with emulsion point
6. Finishes
a) Internal Walls (For Apartments)
i) Living/Dining, Master Bedroom, Bedrooms, Study, Kitchen and Yard
Cement and sand plaster with emulsion paint or Skim coot with emulsion paint
ii) Master Bathroom, Bathrooms and WC
Imported ceramic tiles laid up to false ceiling height and on exposed surface only
iii) Household 5helter
Skim coat with emulsion point
b) Internal Walls (Common Areas)
i) Basement & 1st Storey Lift Lobby Imported ceramic tiles (At designated areas only)
ii) Common Lift Lobby (2nd Storey Upwards), Staircases, Landing and Common Corridors
Cement and sand plaster with emulsion paint
C) External Walls
i) Cement and sand plaster with textured coating or emulsion pointing
d) Floor (For Apartments)
i) Living/Dining/Service Counter (Type C2-P only)
Imported Compressed Marble with skirting
ii) Master Bedroom, Bedrooms and Study
Timber strips with timber skirting
iii) Master Bathroom and Bathrooms
Imported ceramic tiles
iv) Kitchen, WC, Yard. Household Shelter, Balcony, PES, Open Terrace and Roof Terrace
Imported ceramic tiles
v) Private staircese (for Type A-P, B-P, B1-P, B2-P, C-P, C1-P & C2-P only) Timber strips with timber skirting
e) Floor (Common Areas)
i) All Lift Lobbies
Imported ceramic tiles
ii) Common Staircases and Landing
Cement and sand screed
Note: Marble and granite are natural stone materials containing veins with tonality differences. There will be colour and marking caused by their complex mineral composition and incorporated impurities. While such material can be pre-selected before installation. this non-conformity cannot be avoided. Granite tiles are pre-polished before laying and care has been taken for their installation. However, granite, being a much harder material than marble, cannot be re-polished after installation. Hence some differences can be felt at the joint.)
7. Windows
a) Living/Dining, Master Bedroom, Bedrooms, Study, Master Bathroom, Bathrooms and Kitchen (For all Types except Type C-G, C, C-P, C1-G, C1, C1-P)
Aluminium framed windows
b) WC
Aluminium framed windows or fixed louvered windows
Note: -
a) All aluminium frames shall be powder coated finish
b) All glazing shall be approximately 6mm thick
c) All windows are either side-hung, top-hung, bottom-hung or sliding or any combination of the mentioned.
d) All glazing below 1m shall be of tempered or laminated glass
8. Doors
a) Main Entrance
Approved fire-rated timber door
b) Master Bedroom, Bedrooms, Master Bathrooms, Bathrooms and Study
Hollow core timber door
c) Kitchen
Hollow core timber door with glass viewing panel
d) WC
PVC door
e) Yard, PES, Balcony and Roof Terrace
Aluminium framed glass door
f) Household Shelter
Metal door as approved by relevant authority
Note:
-a) All glazing shall be approximately 6mm thick
b) All aluminium frames shall be powder-coated finish
c) Doors can either be of swing or sliding type with or without fixed glass panel
9. Ironmongery
a) Main entrance door and other hollow core timber doors shot be provided with good quality imported lockset
10. Sanitary Fittings
a) Master Bathroom
-1 shower screen with overhead shower and shower mixer
-1 vanity counter c/w basin. mixer top
-1 water closet
-1 mirror
-1 paper holder
-1 towel roil
-1 long bath with mixer (For Type A-P, B-P, B1-P, B2-P, C-P, C1-P & C2-P only)
b) Bathrooms
-1 shower screen with shower mixer
-1 vanity counter c/w basin and mixer top
-1 water closet
-1 mirror
-1 towel rail
c) WC
-1 water closet
-1 paper holder
-1 wall hung basin with cold water top
-1 two-way top with hand shower set
d) Kitchen
-1 single lever sink mixer top
-1 kitchen sink
11. Electrical Installation
a) Concealed electrical wiring in conduits below ceiling level
b) Refer to Electrical Schedule for details
12. TV/ Telephone
Refer to Electrical Schedule for details
13. Lightning Protection
Lightning Protection System shall be provided in accordance with the Singapore Standard CP33
14. Waterproofing
Waterproofing to floors of Kitchen, Mosier Bathroom. Bathrooms. WC, yard, Roof Terrace, Balcony. Planter and Reinforced Concrete Fiat Roof / Open Terrace
15. Recreational Facilities
a) Swimming Pool
b) Wading Pool
c) Gynamsium
d) BBQ Pit
e) Children's Playground
f) Reflective Pool
g) Water Jet Corner
h) Pavilion
16. Driveway and Car Park
a) Concrete finish with floor hardener and/or Interlocking pavers and/or Heavy Duty ceramic tiles
17. Other Items
a) Wardrobes
Built-in wardrobes to all bedrooms
b) Kitchen Cabinets
i) For Types A-G, A, B-G. B, B1-G, B1, B2-G & 82 only
Built-in high and low-level kitchen cabinets complete with cooker hob, cooker hood and built in oven
ii) For Types C-G, C, C1-G, C1, C2-G, C2, A-P, B-P, B1-P, B2-P, C-P,C1-P & C2-P only
Built-in high and low-level kitchen cabinets complete with integrated refrigerator, cooker hob. cooker hood, built-in oven and integrated under counter Freezer
c) Air-conditioning to living/Dining, Study, Master Bedroom and Bedrooms
d) Hot Water Supply to master Bathroom, Bathrooms and Kitchen
e) Audio/Video intercom {from Apartment to Side-Gate only)
f) Card Access provided for Side Gate
18. TV System
SHCV TV points provided
Note: -
1. The brand and model of all equipment and appliances supplied will be provided subject to availability
2. Layout/location of wardrobes. kitchen cabinets and fan coil units are subject to architect's sole discretion and final design.
3. The air-conditioning system has to be maintained and cleaned on a regular basis by the Purchaser. That includes the cleaning of filters and clearing of condensate pipes to ensure good working condition of the system.
4. Connection. subscription and other fees for television. SHCV, Internet and other service providers whether chosen by the Purchaser or appointed by the Vendor or the management corporation when constituted, will be paid by the Purchaser.
5. Equipment for SHCV will be paid and installed by Purchaser.
6. Timber is a natural material containing grain and tonal differences. Thus it is not possible to achieve total consistency of colour and groin in its selection and installation,
DESCRIPTION OF THE HOUSING PROJECT
General Description.
Details of Building Specifications
Please refer to "Specifications of the Building"
Description of Common Property
Common Facilities includes: Swimming Pool. Wading Pool. Gymnasium, BEIO Pit. Children's Playground. Reflective Pool, Water Jet Corner & Pavilion
Purpose Of Building Project and Restrictions as to Use
The building project Is strictly for residential occupation only
Common Area
1. All Carpark Lots are located in the basement
2. A Common Handicap Toilet is provided
3. Management room is not provided
Units
1. The Open Roof Terraces and Balcony are not to be enclosed or roofed over
2. For cyclical maintenance work to be carried out to the building facade. owners of Penthouse Units shall allow access to the maintenance team
3. No access to R.C. flat roof except for maintenance only
4. The Open Roof Terraces are not to be enclosed or roofed over. No structures or other uses are allowed on the rooftop unless otherwise approved by the Competent Authority 5. The Approved Planter Boxes, which are exempted from GFA, are not to be converted to Balcony without prior approval from the Competent Authority