Developer: City Development Ltd No. Of Units: 360 Residential Units Tenure: 99 Years From 12/06/1996 District: 05 TOP: 2001 Unit Types: 2-bedroom: 1012 to 1410 sqft
3-bedroom: 1238 to 1572 sqft
4-bedroom: 1625 to 2099 sqft
Faber Crest, welcome to a tranquil world secluded from the stress of city living.
A place where you can stroll in seemingly endless gardens and wake to the soothing sounds of waterfalls and tropical birds chirping.
While it sounds like a dream resort, it can be your reality: Faber Crest, a condominium estate in harmony with the natural rhythm of life.
Faber Crest nestles in the sanctuary of the Faber Hills Estate, an enclave of landed housing just 15 minutes from the Central Business District via the Ayer Rajah Expressway, and is within walking distance to the Clementi MRT Station.
Faber Crest offers an unrivalled serenity, comprising 12 blocks of 4-storey condos with a total of 360 apartments.
The generous 3.7-hectare site has been carefully utilised to ensure each apartment enjoys maximum privacy, as well as enviable views of landscaped gardens featuring a lagoon pool and waterfall or luscious tropical gardens boasting a gently meandering river.
Relaxation and recreational facilities include an Olympic-sized swimming pool, children’s Jim pool and tennis cowls, plus a clubhouse complete with a gymnasium and fitness area, sauna, steam bath, billiard room and putting green.
Faber Crest Location Map
Faber Crest Street View
Faber Crest Resale/Rental Prices
Let’s Discuss Your Property Plans
Interested in This Property?
Buying, selling or renting? Get a free consultation with realtors with a background in interior and lighting design. We’ll discuss your goals and help you assess your options—from pricing and timelines to layout practicality and space potential.
Share your contact details below, and we will get in touch to understand your needs and suggest the next steps. No pressure. No obligation to proceed.
Other Topics That May Interest You
Enquire About This Property
Check current availability and rental terms, arrange a viewing, or discuss whether the space could meet your business needs.
Share your requirements and we will get in touch. No obligation to proceed.
Other Topics That May Interest You
Site Map & Floor Plans
Faber Crest Site Map
Faber Crest 2 Bedroom/3 Bedroom/4 Bedroom Type A1-1, B1, C1 Floor Plan
Specifications
FOUNDATION Bored cast-in situ concrete piles 50 grade concrete complying with BS 8004
SUPERSTRUCTURE (a) Reinforced concrete framework using 55 grade concrete complying with BS 8110
WALLS (a) External: Reinforced concrete walls/columns and clay brickwalls infill
(b) Internal: Reinforced concrete walls/columns and auto clave aerated concrete block infill/lightweight panel
ROOF (a) Filched roof: Clay roof tiles
(b) Flat roof: Reinforced concrete flat roof with appropriate waterproofing and insulation
CEILING (a) Gypsum board/ plaster board ceiling to kitchens, bathrooms, yard and utility
(b) Cement plaster and paint on concrete ceiling to other parts of the building units
(c) Fibrous plaster board ceiling to all building units on 4th storey
FINISHES (a) Walls (i) Internal Walls (Building Units): Paint to living, dining, bedrooms, utility, yard, corridor and store Ceramic files to false ceiling height to exposed areas of kitchen, bathrooms and w.c.
*Marble/granite to false ceiling height to exposed area of master bath
(ii)External Walls: Cement and sand plaster, with textured coating and painted
(b) Floor (i) Internal floor finishes (Building Units): Marble to living and dining Marble/granile to master bath Laminated floorboard to bedrooms Ceramic tiles to store, yard. utility,lv,e., balcony, kitchen and bathrooms
(ii) External Floor Finishes: Marble/granite to 1st storey and basement lift lobby Ceramic tiles to other lilt lobbies Concrete with hardener to basement carpark
WINDOWS (a) Aluminium framed casement/top hung/ adjustable/fixed louvred windows to living, bedrooms, bathrooms, utility, kitchen and w.c.
(b) Glass - Tinted float glass generally. Obscure glass for bathrooms and w.c.
DOORS (a) Fire-rated door to main entrance and kitchen leading to lift lobby. Flush doors to bedrooms, bathrooms & store. Flush doors with glass - panel to kitchen door leading 10 dining area. Aluminium sliding/folding doors to utility, W.C. Aluminium swing doors to kitchen leading to yard area
(b) Aluminium framed sliding doors for living Glass tinted float glass
(c) Locks - good quality locksets
SANITARY FITTINGS (a) Master Bath: (All types: A, B & C) 1 long bath, 1 shower area with shower screen and door, 1 water closet. 1 vanity basin. I towel rail. 2 soap holder & 1 toilet paper holder
(b) Bath 1: (All types: A, B & C) 1 water closet, 1 vanity basin, 1 bowel rail, 1 soap holder, 1 toilet paper holder and 1 shower area with shower sereen & door
(c) Bath 2: (Type C only) 1 shower area with shower screen &. door, 1 water closet, 1 vanity basin & 1 towel 1 soap holder & 1 toilet paper holder
(d) W.C. 1 wall hung basin, 1 water closet, 1 toilet paperholder, shower point & 1 lap point
(e) kitchen -1 sink
(f) Yard - I bib tap for washing machine
ELECTRICAL INSTALLATION Refer to the Electrical Schedule for details
LIGHTNING PROTECTION All apartment. blocks arc provided with lightning protection system which has been designed in accordance with Singapore Standard CP33:1996
WATERPROOFING Waterproofing to basement floor and will R.C. flat roof, 1st storey garden deck, planter boxes, bathroom, yard, kitchen, w.c. and balcony floor
DRIVEWAY & CARPARK Entrance paving feature of stone/paver/homogeneous tiles Driveway of concrete interlocking pavers Concrete floor with hardener to basement carparks
RECREATION FACILITIES (a) Swimming Pool (b) Children's Wading Pool (c) Tennis Court (d) Clubhouse with: Multi-purpose room, lounge, billiard room, gymnasium mom, Male and Female saunas, steam bath, jacuazi, management office and changing rooms (e) Children's playgrounds (f) BBQ areas (g) Water features (h) Fitness area (i) Putting green
ADDITIONAL ITEMS (a) Kitchen cabinets - high & low kitchen cabinets with laminated finish (b) Bedroom wardrobes built-in-wardrobes with laminated finish (c) Airconditioners - wall mounted air-conditioning system is provided to living/dining and bedrooms (d) Appliances- a cooker hub, a cooker hood & oven to kitchen (f) Hot water supply from central gas water healer is provided to bathrooms and kitchen (g) Gas connection from Power Gas will be provided for each apartment unit
GENERAL DESCRIPTION This development comprises 12 blocks of 4-storey residential block (total 360 units) with basement carparks, ancillary clubhouse facilities with elevated tennis courts and a shop unit.
Developer: Faber-Rhine Properties Pte Ltd. Tenure of Land: 99 years leasehold. Lot/Mukim 6658K MR5. Mainline. Approval No DC 95/0990-2(260496-01E3). Building Plan Approval No: BP2-82741-1996-BPNE001. Date of BP Approval: 10 November 1997. Expected Date of TOP: 31 Dec 2002. Expected Date of Legal Completion: 31 Dec 2006. Developer's Licence No: B1133.
Reviews
There are no reviews yet.