FOUNDATION
Bored cast-in situ concrete piles 50 grade concrete complying with BS 8004
SUPERSTRUCTURE
(a) Reinforced concrete framework using 55 grade concrete complying with BS 8110
WALLS
(a) External: Reinforced concrete walls/columns and clay brickwalls infill
(b) Internal: Reinforced concrete walls/columns and auto clave aerated concrete block infill/lightweight panel
ROOF
(a) Filched roof: Clay roof tiles
(b) Flat roof: Reinforced concrete flat roof with appropriate waterproofing and insulation
CEILING
(a) Gypsum board/ plaster board ceiling to kitchens, bathrooms, yard and utility
(b) Cement plaster and paint on concrete ceiling to other parts of the building units
(c) Fibrous plaster board ceiling to all building units on 4th storey
FINISHES
(a) Walls
(i) Internal Walls (Building Units):
Paint to living, dining, bedrooms, utility, yard, corridor and store Ceramic files to false ceiling height to exposed areas of kitchen, bathrooms and w.c.
*Marble/granite to false ceiling height to exposed area of master bath
(ii)External Walls:
Cement and sand plaster, with textured coating and painted
(b) Floor
(i) Internal floor finishes (Building Units):
Marble to living and dining
Marble/granile to master bath
Laminated floorboard to bedrooms
Ceramic tiles to store, yard. utility,lv,e., balcony, kitchen and bathrooms
(ii) External Floor Finishes:
Marble/granite to 1st storey and basement lift lobby
Ceramic tiles to other lilt lobbies
Concrete with hardener to basement carpark
WINDOWS
(a) Aluminium framed casement/top hung/ adjustable/fixed louvred windows to living, bedrooms, bathrooms, utility, kitchen and w.c.
(b) Glass - Tinted float glass generally. Obscure glass for bathrooms and w.c.
DOORS
(a) Fire-rated door to main entrance and kitchen leading to lift lobby. Flush doors to bedrooms, bathrooms & store. Flush doors with glass - panel to kitchen door leading 10 dining area. Aluminium sliding/folding doors to utility, W.C. Aluminium swing doors to kitchen leading to yard area
(b) Aluminium framed sliding doors for living Glass tinted float glass
(c) Locks - good quality locksets
SANITARY FITTINGS
(a) Master Bath: (All types: A, B & C)
1 long bath, 1 shower area with shower screen and door, 1 water closet. 1 vanity basin. I towel rail. 2 soap holder & 1 toilet paper holder
(b) Bath 1: (All types: A, B & C)
1 water closet, 1 vanity basin, 1 bowel rail, 1 soap holder, 1 toilet paper holder and 1 shower area with shower sereen & door
(c) Bath 2: (Type C only)
1 shower area with shower screen &. door, 1 water closet, 1 vanity basin & 1 towel 1 soap holder & 1 toilet paper holder
(d) W.C.
1 wall hung basin, 1 water closet, 1 toilet paperholder, shower point & 1 lap point
(e) kitchen -1 sink
(f) Yard - I bib tap for washing machine
ELECTRICAL INSTALLATION
Refer to the Electrical Schedule for details
LIGHTNING PROTECTION
All apartment. blocks arc provided with lightning protection system which has been designed in accordance with Singapore Standard CP33:1996
PAINTING
Internal WallS - emulsion paint
External Walls - generally textured paint coaling
WATERPROOFING
Waterproofing to basement floor and will R.C. flat roof, 1st storey garden deck, planter boxes, bathroom, yard, kitchen, w.c. and balcony floor
DRIVEWAY & CARPARK
Entrance paving feature of stone/paver/homogeneous tiles
Driveway of concrete interlocking pavers
Concrete floor with hardener to basement carparks
RECREATION FACILITIES
(a) Swimming Pool
(b) Children's Wading Pool
(c) Tennis Court
(d) Clubhouse with: Multi-purpose room, lounge, billiard room, gymnasium mom, Male and Female saunas, steam bath, jacuazi, management office and changing rooms
(e) Children's playgrounds
(f) BBQ areas
(g) Water features
(h) Fitness area
(i) Putting green
ADDITIONAL ITEMS
(a) Kitchen cabinets - high & low kitchen cabinets with laminated finish
(b) Bedroom wardrobes built-in-wardrobes with laminated finish
(c) Airconditioners - wall mounted air-conditioning system is provided to living/dining and bedrooms
(d) Appliances- a cooker hub, a cooker hood & oven to kitchen
(f) Hot water supply from central gas water healer is provided to bathrooms and kitchen
(g) Gas connection from Power Gas will be provided for each apartment unit
GENERAL DESCRIPTION
This development comprises 12 blocks of 4-storey residential block (total 360 units) with basement carparks, ancillary clubhouse facilities with elevated tennis courts and a shop unit.
Developer: Faber-Rhine Properties Pte Ltd. Tenure of Land: 99 years leasehold. Lot/Mukim 6658K MR5. Mainline. Approval No DC 95/0990-2(260496-01E3). Building Plan Approval No: BP2-82741-1996-BPNE001. Date of BP Approval: 10 November 1997. Expected Date of TOP: 31 Dec 2002. Expected Date of Legal Completion: 31 Dec 2006. Developer's Licence No: B1133.