ACCESSIBILITY
• Direct sheltered link to one-north MRT station
• 10 minutes’ drive to city and 20 minutes’ drive to Singapore Changi Airport via Ayer Rajah Expressway
BUILDING SPECIFICATIONS
Type of Building
• An integrated 17-storey Business Park / Office Tower with 34 Work Lofts, and 2 levels of basement car park
• 2-storeys of F&B outlets
• BCA Green Mark Platinum Award
• Green features: Extensive greenery, recycling bins at common areas, high efficiency multi-tiered chiller plant and air-conditioning system, intelligent lighting control, high ecofriendly interior fittings and materials, effective Envelope Thermal Transfer Value
Floor Area
• Total NLA:
- Business Park/Office: Approx. 53,463 sqm
- Retail/F&B: Approx. 4,105
- Work Lofts: 34 units ranging from 37 to 83 sqm
Typical Floor Plate
• Business Park / Office ranges from 1,740 to 3,867 sqm
Floor Loading
• 1st - 17th storey : 5.0 kN/sqm
• Roof : 7.5 kN/sqm
Ceiling Height
• Floor to false ceiling
- 1st - 6th storey: 2.8 m
- 2nd - 4th storey: Approx. 3.0 m
- 5th storey: Approx. 2.8 m
Column Grid
• Approx. 9.6 m x 17.0 m
Lifts
• Business Park/Office Tower
- West Tower (up to 7th floor)
Passenger lifts: 2 x 1,155 kg (17 persons)
Service lifts: 2 x 1,630 kg
- Dimension: 1.6 m (W) x 2.25 m (D) x 2.7 m (H)
- Lift car door size: 2.4 m (W) x 1.1 m (H)
- East Tower (up to 17th floor)
Passenger lifts: 4 x 2,040 kg (30 persons) serving 1st, 3rd to
10th storey
Passenger lifts: 5 x 2,040 kg (30 persons) serving 1st, 11th to 17th storey
Service lifts: 2 x 1,630 kg
- Dimension: 1.6 m (W) x 2.25 m (D) x 2.7 m (H)
- Lift car door size: 2.4 m (W) x 1.1 m (H)
• Work Lofts
- Passenger/firemen/service lifts: 2 x 1,155 kg
• Car Park Lifts
- 2 car park lifts serving B1, B2, 1st and 2nd storey e-deck
• Retail Escalators at designated locations connecting 1st and 2nd storeys of retail podium, direct link to one-north MR
Loading Bay Facilities
• 5 loading/unloading bays at B1 and 1st storey
Parking Lots
• Car: Approx. 300
Air-conditioning System
• 2 AHUs per floor central chilled water supply to Business Park/Office Tower
• Air-conditioning provided to Business Park/Office Tower during office hours from Mon to Fri (8am - 6pm) except Public Holidays
• Individual air-conditioning system to work lofts and retail podium
Power Supply Allocation
• Contestable metering scheme to the whole development
• Dual feed for 22kV incoming supply
• Approx. 75 watts per sqm of lettable area (3-Phase)
Provisions
• Raised Floor Overall height of 150mm
• Turnstile at main lobby. Card readers to all lift cars
• Destination group-control passenger lift system at Business Park/Office Tower
• Floor traps provision at designated locations
• MATV, telecom cabling, infrastructure for fibre-optic available for tap-off at MDF room and riser, where applicable
• Each Galaxis Work Loft is furnished with kitchen fittings, induction cooking hob and hood, refrigerator, instant water heater, sanitary ware and toilet fittings
Amenities
• Food court, restaurants, cafes, retail shops, fitness studio and service office