Own A Freehold Food Factory
Strategically located in the heart of vibrant Tai Seng Precinct, Mactaggart FoodLink is a 5-storey B1 food industrial space with efficient layout. This Freehold food industrial building is an ideal space to fulfil aspirations of your culinary business operations and expansion, whether it is a food processing or packaging.
The Ideal Space
Units with approximately 6.3 to 8 metres floor to floor height available
Regular unit layout for efficient space planning
Column free internal space
Minimum 10KN/m2 floor loading within unit
Dual vehicular access for operational clarity
Ancillary office space for selected units
Link ToEndless Possibilities
Mactaggart FoodLink, a purpose-built food industrial space is specially designed to cater to your food operations or even more sophisticated culinary set up. Workflow efficiency at Mactaggart FoodLink is enhanced with assigned lift access and dedicated service bays.
3-Minutes Walk to Tai Seng MRT Station and to the nearest Bus-stop
Well connected to Major Expressways (KPE & PIE)
Within vicinity of established business districts and eateries at Tai Seng and Macpherson
Near to mature residential estates for your workforce needs
4. Roof Reinforced concrete flat roof with waterproofing and insulation and/or metal roof with insulation and/or glass roof at designated area.
5. Ceiling Concrete ceiling soffit with skim coat and emulsion paint finish. Lift lobbies, common corridors and toilets with skim coat and/or water resistant ceiling board with emulsion paint finish, where applicable.
Estimated Floor to Floor Height 1st Storey to 2nd Storey 8.00m approximately 1st Storey to 1st Mezzanine Storey 4.00m approximately 2nd Storey to 3rd Storey 6.30m approximately 2nd Storey to 2nd Mezzanine Storey 3.15m approximately 3rd Storey to 4th Storey 6.30m approximately 3rd Storey to 3rd Mezzanine Storey 3.10m approximately 4th Storey to 5th Storey 6.30m approximately 4th Storey to 4th Mezzanine Storey 3.10m approximately 5th Storey to Roof 8.00m approximately 5th Storey to 5th Mezzanine Storey 4.00m approximately
6. Finishes (a) Wall i. Common areas - Cement and sand plastering and/or skim coat with paint finish and/or spray textured finish and/or ceramic tiles ii. Factory units - Cement and sand plastering and/or skim coat with paint finish, ceramic tiles to toilet walls (up to false ceiling) (b) Floor i. Factory units - power float concrete with hardener and waterproofing where applicable ii. Toilets/bin centre: anti slip homogeneous tiles with waterproofing iii. A/C ledge - cement and sand screed finish with waterproofing where applicable iv. Lift lobbies - stone and/or homogeneous tiles and/or power float concrete with harderner v. Staircase - cement and sand screed finish with nosing tiles and/or metal plate with paint and/or natural finish vi. M&E rooms - cement and sand screed finish vii. Roof garden - cement and sand screed finish and/or homogenous tiles with waterproofing and/or artificial turfing viii. Driveway – power float concrete with hardener and/or premix
8. Doors Metal and/or framed/frameless glass and/or timber doors.
9. Plumbing and Sanitary Plumbing & sanitary installation are provided in accordance with statutory requirements.
10. Electrical Installation Each unit is provided with 120Amps 3 Phase isolator.
11. Lightning Protection Lightning protection system provided in accordance with prevailing code of practice.
12. Painting Weather-resistant paint and/or spray-textured finish to the external and emulsion paint to the internal surfaces where applicable.
13. Waterproofing Waterproofing provided to all slabs resting on ground, internal wet areas (e.g. toilets and bin centres), production areas, slabs above water-sensitive areas (e.g. substations) and areas open to sky (e.g. Reinforced concrete roof slab)
14. Turfing In compliance with NParks’ requirements.
15. Air-Conditioning and Mechanical Ventilation Natural/Mechanical ventilation shall be provided in compliance with statutory requirements in designated areas. All factory units are naturally and/or mechanically ventilated with AC ledge provision for factory unit’s own AC installation. The toilets within the factory units are provided with natural and/or mechanical ventilation in compliance with statutory requirement.
16. Lifts 01 no. of common passenger lift 02 nos. of common service lift
17. Exhaust Shaft Provision of exhaust shaft to Factory units up to the roof. Wet chemical suppression system, exhaust fans, hood, fresh air fans & air cleaner and accessories are to be provided by Purchaser to comply with NEA requirements connecting to Vendor provided exhaust shaft. To ensure good performance of the exhaust system, maintenance for respective unit’s exhaust system to the external shall be done by unit owner.
18. Gas Supply Gas supply provision is capped-off at high level just within each factory unit.
19. Fire Protection System Fire protection system provided in accordance with statutory requirements.
20. Floor Loading Factory Unit Floor Loading (kN/m2) 1st Storey 15 2nd Storey to 5th Storey 10
Whilst reasonable care has been taken in the preparation of this website, the developer cannot be held responsible for any inaccuracies or omissions. The statement, information and depictions shall not be regarded or relied upon as statement or representations of fact, and are subjected to such changes as may be required by the developer or the relevant authorities, and cannot form part of an order or contract. Visual representations, models, showflat, illustrations, photographs, pictures, drawings, display and art rendering are artists’ impressions only, and cannot be regarded as representations of fact. All plans and layouts are not to scale and are subject to change/amendments as may be directed or approved by relevant authorities. The floor areas indicated in the brochure are approximate measurements only and are subject to final survey. The Sale and Purchase Agreement shall form the entire agreement between the developer and the purchaser and shall in no way be modified by any statements or representations (whether contained in this brochure or otherwise). All information, plans and specifications are current at the time of printing of this website and are subject to changes as may be required or approved by the developer or the relevant authorities.
E-Brochure
Mactaggart Foodlink E-Brochure
Reviews
There are no reviews yet.
Be the first to review “MacTaggart Foodlink” Cancel reply
Chat With Us Today!
Own your dream property stress-free. We go beyond real estate. Our interior design-trained realtors provide a one-stop shop for all your property needs: buying, selling, renting, and everything in between. We will help you with financing and tax planning, investment analysis and portfolio management, timeline planning and space optimization and even interior design assistance before renting or purchasing the property. Get a free consultation today and let our professionals guide you every step of the way.
Reviews
There are no reviews yet.