Skip to content

MacTaggart Foodlink

Developer: Smooth Venture Pte Ltd
No. Of Units: 28 Food Factory Units
Architect: AC Consortium Pte Ltd
Site Area: 5,297.29 sqm
Tenure: Freehold
District: 13
TOP: 30 Sep 2020
Carpark: Basement : 13 Car & 1 handicap, 1st Storey : 2 car & 2 lorry
Unit Types:
Food Factory: 2465 to 2702 sqft (28 Units)

About MacTaggart Foodlink

Own A Freehold Food Factory
Strategically located in the heart of vibrant Tai Seng Precinct, Mactaggart FoodLink is a 5-storey B1 food industrial space with efficient layout. This Freehold food industrial building is an ideal space to fulfil aspirations of your culinary business operations and expansion, whether it is a food processing or packaging.

Exterior view of MacTaggart Foodlink, a modern multi-storey industrial building with sleek horizontal lines and a contemporary facade, featuring landscaped greenery and a driveway with parked cars and pedestrians in front.

The Ideal Space
Units with approximately 6.3 to 8 metres floor to floor height available

Regular unit layout for efficient space planning

Column free internal space

Minimum 10KN/m2 floor loading within unit

Dual vehicular access for operational clarity

Ancillary office space for selected units

Cross-section view of MacTaggart Foodlink, showing the building’s multi-level interior with dedicated spaces for food storage, production, and distribution, including loading bays, cold rooms, office areas, and various processing units, set against a backdrop of greenery and a clear sky.

Aerial view of MacTaggart Foodlink, highlighting the building’s contemporary design with tiered horizontal fins, rooftop greenery with landscaped seating areas, and a surrounding tree-lined road with cars and pedestrians.

Link To Endless Possibilities
Mactaggart FoodLink, a purpose-built food industrial space is specially designed to cater to your food operations or even more sophisticated culinary set up. Workflow efficiency at Mactaggart FoodLink is enhanced with assigned lift access and dedicated service bays.

3-Minutes Walk to Tai Seng MRT Station and to the nearest Bus-stop

Well connected to Major Expressways (KPE & PIE)

Within vicinity of established business districts and eateries at Tai Seng and Macpherson

Near to mature residential estates for your workforce needs

Ground-level view of MacTaggart Foodlink showing the building’s modern facade with curved horizontal fins and vertical louvered panels, alongside delivery trucks and pedestrians near the loading and drop-off area.

Location map showing the strategic position of MacTaggart Foodlink along Upper Paya Lebar Road in Singapore, with nearby MRT stations including Tai Seng, MacPherson, Bartley, Serangoon, and Paya Lebar, and surrounding estates and business clusters such as Ubi Business Cluster and Kallang Business Cluster.

Street-level view of MacTaggart Foodlink, showcasing the building’s modern architectural design with flowing horizontal fins, rooftop greenery, and a ground-floor entrance area with pedestrians and vehicles in front, set against a clear blue sky.

MacTaggart Foodlink Location Map

MacTaggart Foodlink Street View

MacTaggart Foodlink Resale/Rental Prices






Floor Plans

MacTaggart Foodlink Site Map

Site map of MacTaggart Foodlink showing the building layout and key access points, including the main vehicular entrance, roof garden, M&E spaces, bin centre, and service access for loading and unloading, bordered by Burn Road and MacTaggart Road.

MacTaggart Foodlink 1st Storey Floor Plans

First storey floor plan of MacTaggart Foodlink, detailing the layout of units #01-02 and #01-03, loading and unloading bay, driveway, ramp to basement, substation, M&E space, bin centre, and lift lobbies.

MacTaggart Foodlink 1st Storey Mezzanine Floor Plans

First storey mezzanine floor plan of MacTaggart Foodlink, displaying the layout of mezzanine spaces for units #01-02 and #01-03, with void areas, staircases, substation, and AC ledges, along with the driveway layout.

MacTaggart Foodlink 2nd Storey Floor Plans

Second storey floor plan of MacTaggart Foodlink, showing seven units (#02-01 to #02-07) with their respective floor areas, lift lobbies, staircases, corridors, and AC ledges arranged around a central layout.

MacTaggart Foodlink 2nd Storey Mezzanine Floor Plans

Second storey mezzanine floor plan of MacTaggart Foodlink, featuring mezzanine layouts for units #02-01 to #02-07 with void areas, staircases, AC ledges, and connecting corridors.

MacTaggart Foodlink 3rd Storey Floor Plans

Third storey floor plan of MacTaggart Foodlink, showing seven units (#03-01 to #03-07) with their respective floor areas, lift lobbies, staircases, central corridor, and AC ledges arranged around the building layout.

MacTaggart Foodlink 3rd Storey Mezzanine Floor Plans

Third storey mezzanine floor plan of MacTaggart Foodlink, displaying mezzanine layouts for units #03-01 to #03-07 with void spaces, staircases, AC ledges, and connecting corridors.

MacTaggart Foodlink 4th Storey Floor Plans

Fourth storey floor plan of MacTaggart Foodlink, featuring seven units (#04-01 to #04-07) with their respective floor areas, central corridor, lift lobbies, staircases, and AC ledges arranged in the building layout.

MacTaggart Foodlink 4th Storey Mezzanine Floor Plans

Fourth storey mezzanine floor plan of MacTaggart Foodlink, showing mezzanine layouts for units #04-01 to #04-07 with void spaces, AC ledges, staircases, and connecting corridors within the building layout.

MacTaggart Foodlink 5th Storey Floor Plans

Fifth storey floor plan of MacTaggart Foodlink, featuring five units (#05-01 to #05-05) with their respective floor areas, central corridor, lift lobbies, staircases, AC ledges, and a designated roof garden area on the same level.

MacTaggart Foodlink 5th Storey Mezzanine Floor Plans

Fifth storey mezzanine floor plan of MacTaggart Foodlink, showing mezzanine layouts for units #05-01 to #05-05 with void spaces, AC ledges, staircases, connecting corridors, and the roof garden area located below.

Videos

Mactaggart Foodlink Flythrough Animation Video

Specifications

1. Foundation
Piling system to Structural Engineer’s detail and/or design.

2. Structure
Reinforced concrete structure and/or structural steelwork to Structural Engineer’s detail and/or design.

3. Walls
Precast concrete panel and/or reinforced concrete and/or glass panel and/or brickwall and/or blockwall.

4. Roof
Reinforced concrete flat roof with waterproofing and insulation and/or metal roof with insulation and/or glass roof at designated area.

5. Ceiling
Concrete ceiling soffit with skim coat and emulsion paint finish. Lift lobbies, common corridors and toilets with skim coat and/or water resistant ceiling board with emulsion paint finish, where applicable.

Estimated Floor to Floor Height
1st Storey to 2nd Storey 8.00m approximately
1st Storey to 1st Mezzanine Storey 4.00m approximately
2nd Storey to 3rd Storey 6.30m approximately
2nd Storey to 2nd Mezzanine Storey 3.15m approximately
3rd Storey to 4th Storey 6.30m approximately
3rd Storey to 3rd Mezzanine Storey 3.10m approximately
4th Storey to 5th Storey 6.30m approximately
4th Storey to 4th Mezzanine Storey 3.10m approximately
5th Storey to Roof 8.00m approximately
5th Storey to 5th Mezzanine Storey 4.00m approximately

6. Finishes
(a) Wall
i. Common areas - Cement and sand plastering and/or skim coat with paint finish and/or spray textured finish and/or ceramic tiles
ii. Factory units - Cement and sand plastering and/or skim coat with paint finish, ceramic tiles to toilet walls (up to false ceiling)
(b) Floor
i. Factory units - power float concrete with hardener and waterproofing where applicable
ii. Toilets/bin centre: anti slip homogeneous tiles with waterproofing
iii. A/C ledge - cement and sand screed finish with waterproofing where applicable
iv. Lift lobbies - stone and/or homogeneous tiles and/or power float concrete with harderner
v. Staircase - cement and sand screed finish with nosing tiles and/or metal plate with paint and/or natural finish
vi. M&E rooms - cement and sand screed finish
vii. Roof garden - cement and sand screed finish and/or homogenous tiles with
waterproofing and/or artificial turfing
viii. Driveway – power float concrete with hardener and/or premix

7. Windows
Aluminum framed glass window and/or framed fixed glass panels.

8. Doors
Metal and/or framed/frameless glass and/or timber doors.

9. Plumbing and Sanitary
Plumbing & sanitary installation are provided in accordance with statutory requirements.

10. Electrical Installation
Each unit is provided with 120Amps 3 Phase isolator.

11. Lightning Protection
Lightning protection system provided in accordance with prevailing code of practice.

12. Painting
Weather-resistant paint and/or spray-textured finish to the external and emulsion paint to the internal surfaces where applicable.

13. Waterproofing
Waterproofing provided to all slabs resting on ground, internal wet areas (e.g. toilets and bin centres), production areas, slabs above water-sensitive areas (e.g. substations) and areas open to sky (e.g. Reinforced concrete roof slab)

14. Turfing
In compliance with NParks’ requirements.

15. Air-Conditioning and Mechanical Ventilation
Natural/Mechanical ventilation shall be provided in compliance with statutory requirements in designated areas. All factory units are naturally and/or mechanically ventilated with AC ledge provision for factory unit’s own AC installation. The toilets within the factory units are provided with natural and/or mechanical ventilation in compliance with statutory requirement.

16. Lifts
01 no. of common passenger lift
02 nos. of common service lift

17. Exhaust Shaft
Provision of exhaust shaft to Factory units up to the roof. Wet chemical suppression system, exhaust fans, hood, fresh air fans & air cleaner and accessories are to be provided by Purchaser to comply with NEA requirements connecting to Vendor provided exhaust shaft. To ensure good performance of the exhaust system, maintenance for respective unit’s exhaust system to the external shall be done by unit owner.

18. Gas Supply
Gas supply provision is capped-off at high level just within each factory unit.

19. Fire Protection System
Fire protection system provided in accordance with statutory requirements.

20. Floor Loading
Factory Unit Floor Loading (kN/m2)
1st Storey 15
2nd Storey to 5th Storey 10

Whilst reasonable care has been taken in the preparation of this website, the developer cannot be held responsible for any inaccuracies or omissions. The statement, information and depictions shall not be regarded or relied upon as statement or representations of fact, and are subjected to such changes as may be required by the developer or the relevant authorities, and cannot form part of an order or contract. Visual representations, models, showflat, illustrations, photographs, pictures, drawings, display and art rendering are artists’ impressions only, and cannot be regarded as representations of fact. All plans and layouts are not to scale and are subject to change/amendments as may be directed or approved by relevant authorities. The floor areas indicated in the brochure are approximate measurements only and are subject to final survey. The Sale and Purchase Agreement shall form the entire agreement between the developer and the purchaser and shall in no way be modified by any statements or representations (whether contained in this brochure or otherwise). All information, plans and specifications are current at the time of printing of this website and are subject to changes as may be required or approved by the developer or the relevant authorities.

E-Brochure

Mactaggart Foodlink E-Brochure

Reviews

There are no reviews yet.

Be the first to review “MacTaggart Foodlink”

Your email address will not be published. Required fields are marked *

Chat With Us Today!

Own your dream property stress-free. We go beyond real estate. Our interior design-trained realtors provide a one-stop shop for all your property needs: buying, selling, renting, and everything in between. We will help you with financing and tax planning, investment analysis and portfolio management, timeline planning and space optimization and even interior design assistance before renting or purchasing the property. Get a free consultation today and let our professionals guide you every step of the way.

Other Topics That May Interest You