1. Foundation
Piling system to Structural Engineer’s detail and/or design.
2. Structure
Reinforced concrete structure and/or structural steelwork to Structural Engineer’s detail and/or design.
3. Walls
Precast concrete panel and/or reinforced concrete and/or glass panel and/or brickwall and/or blockwall.
4. Roof
Reinforced concrete flat roof with waterproofing and insulation and/or metal roof with insulation and/or glass roof at designated area.
5. Ceiling
Concrete ceiling soffit with skim coat and emulsion paint finish. Lift lobbies, common corridors and toilets with skim coat and/or water resistant ceiling board with emulsion paint finish, where applicable.
Estimated Floor to Floor Height
1st Storey to 2nd Storey 8.00m approximately
1st Storey to 1st Mezzanine Storey 4.00m approximately
2nd Storey to 3rd Storey 6.30m approximately
2nd Storey to 2nd Mezzanine Storey 3.15m approximately
3rd Storey to 4th Storey 6.30m approximately
3rd Storey to 3rd Mezzanine Storey 3.10m approximately
4th Storey to 5th Storey 6.30m approximately
4th Storey to 4th Mezzanine Storey 3.10m approximately
5th Storey to Roof 8.00m approximately
5th Storey to 5th Mezzanine Storey 4.00m approximately
6. Finishes
(a) Wall
i. Common areas - Cement and sand plastering and/or skim coat with paint finish and/or spray textured finish and/or ceramic tiles
ii. Factory units - Cement and sand plastering and/or skim coat with paint finish, ceramic tiles to toilet walls (up to false ceiling)
(b) Floor
i. Factory units - power float concrete with hardener and waterproofing where applicable
ii. Toilets/bin centre: anti slip homogeneous tiles with waterproofing
iii. A/C ledge - cement and sand screed finish with waterproofing where applicable
iv. Lift lobbies - stone and/or homogeneous tiles and/or power float concrete with harderner
v. Staircase - cement and sand screed finish with nosing tiles and/or metal plate with paint and/or natural finish
vi. M&E rooms - cement and sand screed finish
vii. Roof garden - cement and sand screed finish and/or homogenous tiles with
waterproofing and/or artificial turfing
viii. Driveway – power float concrete with hardener and/or premix
7. Windows
Aluminum framed glass window and/or framed fixed glass panels.
8. Doors
Metal and/or framed/frameless glass and/or timber doors.
9. Plumbing and Sanitary
Plumbing & sanitary installation are provided in accordance with statutory requirements.
10. Electrical Installation
Each unit is provided with 120Amps 3 Phase isolator.
11. Lightning Protection
Lightning protection system provided in accordance with prevailing code of practice.
12. Painting
Weather-resistant paint and/or spray-textured finish to the external and emulsion paint to the internal surfaces where applicable.
13. Waterproofing
Waterproofing provided to all slabs resting on ground, internal wet areas (e.g. toilets and bin centres), production areas, slabs above water-sensitive areas (e.g. substations) and areas open to sky (e.g. Reinforced concrete roof slab)
14. Turfing
In compliance with NParks’ requirements.
15. Air-Conditioning and Mechanical Ventilation
Natural/Mechanical ventilation shall be provided in compliance with statutory requirements in designated areas. All factory units are naturally and/or mechanically ventilated with AC ledge provision for factory unit’s own AC installation. The toilets within the factory units are provided with natural and/or mechanical ventilation in compliance with statutory requirement.
16. Lifts
01 no. of common passenger lift
02 nos. of common service lift
17. Exhaust Shaft
Provision of exhaust shaft to Factory units up to the roof. Wet chemical suppression system, exhaust fans, hood, fresh air fans & air cleaner and accessories are to be provided by Purchaser to comply with NEA requirements connecting to Vendor provided exhaust shaft. To ensure good performance of the exhaust system, maintenance for respective unit’s exhaust system to the external shall be done by unit owner.
18. Gas Supply
Gas supply provision is capped-off at high level just within each factory unit.
19. Fire Protection System
Fire protection system provided in accordance with statutory requirements.
20. Floor Loading
Factory Unit Floor Loading (kN/m2)
1st Storey 15
2nd Storey to 5th Storey 10
Whilst reasonable care has been taken in the preparation of this website, the developer cannot be held responsible for any inaccuracies or omissions. The statement, information and depictions shall not be regarded or relied upon as statement or representations of fact, and are subjected to such changes as may be required by the developer or the relevant authorities, and cannot form part of an order or contract. Visual representations, models, showflat, illustrations, photographs, pictures, drawings, display and art rendering are artists’ impressions only, and cannot be regarded as representations of fact. All plans and layouts are not to scale and are subject to change/amendments as may be directed or approved by relevant authorities. The floor areas indicated in the brochure are approximate measurements only and are subject to final survey. The Sale and Purchase Agreement shall form the entire agreement between the developer and the purchaser and shall in no way be modified by any statements or representations (whether contained in this brochure or otherwise). All information, plans and specifications are current at the time of printing of this website and are subject to changes as may be required or approved by the developer or the relevant authorities.