Monterey Park Condominium is a 999-year condominium located in District 05, 29 West Coast Rise. It was completed in 2006 and has a total of 280 residential units. The nearest MRT station is Clementi MRT (1.37km) which provide residents easy access to other areas of Singapore.
Monterey Park Condominium is also close to primary schools like Qifa Primary School (0.64km), Nan Hua Primary School (0.99km), Clementi Primary School (1.16km), Pei Tong Primary School (1.64km) and Bukit Timah Primary School (2.75 km). Nearby secondary schools include Commonwealth Secondary School (0.85km), Tanglin Secondary School (1.0km), Clementi Town Secondary School (1.02km), Nan Hua School (2.00km) and NUS High School Of Mathematics And Science (2.17km).
Monterey Park Condominium also enjoy easy access to a variety of amenities, including The Clementi Mall (1.30km), 321 Clementi (1.45km) and JEM (2.09km).
Monterey Park Condominium Location Map
Monterey Park Condominium Street View
Monterey Park Condominium Resale/Rental Prices
Floor Plans
Monterey Park Condominium Site Map
Monterey Park Condominium Block 23, 25, 27 Unit Distribution Chart
Monterey Park Condominium Block 29, 31, 33 Unit Distribution Chart
Monterey Park Condominium 2 Bedroom + Study Type A1 Floor Plan
Monterey Park Condominium 3 Bedroom + Study Type B1 Floor Plan
Monterey Park Condominium 3 Bedroom Type B2 Floor Plan
Monterey Park Condominium 3 Bedroom Type B3 Floor Plan
Monterey Park Condominium 3 Bedroom Type B4 Floor Plan
Monterey Park Condominium 4 Bedroom Type C1 Floor Plan
Monterey Park Condominium 4 Bedroom Type C2 Floor Plan
FLAT ROOF Reinforced concrete roof with appropriate waterproofing system.
CEILING (a) Living/Dining, Bedrooms, Study, Kitchen, Corridor leading to Bedrooms and Bathrooms, Yard and W.C.: Reinforced concrete slab, with skim coating &/or plaster ceiling boards &/or box-ups to designated areas (b) Household Shelter: Reinforced concrete slab with skim coating
FINISHES Wall (for Apartment) (i) Living/Dining, Bedrooms Study, Corridor leading to Bedrooms, Yard and Household Sheller: Cement and sand plaster &/or skim coating with paint finish
(ii) Master Bathroom: Selected marble tiles &/or ceramic tiles laid up to false ceiling height and on exposed surfaces only
(iii) Common and attached Bathrooms: Selected marble or ceramic tiles laid up to false ceiling height and on exposed surfaces only
(iv) Yard W.C.: Ceramic tiles laid up to false ceiling height and on exposed surfaces only
(v) Kitchen: Selected ceramic tiles laid up to false ceiling height and on exposed surfaces only
Floor (for Apartment) (i) Living/Dining, Corridor leading to Bedrooms and Study: Selected marble floor & skirting or selected timber floor & timber skirting
(ii) Bedrooms: Teak parquet floor with timber skirting or lightwashed laminated floor with timber skirting
(iii) Master Bathroom: Selected marble with accent granite tiles at shower area &/or or ceramic tiles with accent granite tiles at shower area
(iv) Common and attached Bathrooms: Selected marble with accent granite tiles at shower area &/or or ceramic tiles with accent granite tiles at shower area
(vii) Private Enclosed Space (P.E.S.): Selected ceramic tiles
Wall (for Common Areas) (i) Internal Walls -1st Storey Lift Lobbies: Selected marble/granite/limestone/sandstone or ceramic tiles, cement and sand plaster &/or skim coating with paint finish to designated areas - Lift Lobbies (2nd Storey upwards), Corridors and Staircase and Landings: Cement and sand plaster &/or skim coating with paint finish
(ii) External Walls: Cement and sand plaster &/or skim coating with textured paint finish
(ii) Lift Lobbies (2nd Storey upwards) and Corridors: Selected tiles
(iii) Staircases and Landing (Basement to 2nd Storey landing): Selected tiles &/or cement screed mixture
(iv) Staircase and Landing (2nd Storey upwards): Cement and sand screed &/or concrete finish
WINDOWS (i) Selected oluminium frame/UPVC white frames with tinted gloss
(ii) All glazing up to lm from the floor level shall be safety glass
DOORS (i) Main Entrance: Approved half-hour fire-rated timber door
(ii) Bedrooms and Bathrooms: Selected timber door
(iii) Dining to Kitchen: Selected pocket sliding door, with in-fill fixed glass panel
(iv) Balcony, Terrace and P.E.S.: Selected aluminium frome/UPVC white frame gloss door
(v) Kitchen to Yard: Selected while UPVC/gloss door (no door provision for Types Al )
(vi) W.C.: Selected aluminium frame/acrylic folding door
(vii) Household Shelter: Pointed steel door
Ironmongery — Selected quality locksets to the main entrance door and other timber doors.
SANITARY FITTINGS (a) Master Bathroom - 1 composite resin vanity top complete with a basin and mixer tap - 1 long bath complete with 1 gloss panel shower cubicle & both/shower mixer & overhead rain shower head - 1 pedestal water closet - 1 towel rail - 1 mirror - 1 toilet paper holder
(b) Common Bathroom & Attached Bathroom - 1 composite resin vanity top complete with a semi-recessed basin and mixer - 1 glass panel shower cubicle complete with shower mixer - 1 pedestal water closet - 1 towel rail - 1 mirror - 1 toilet paper holder
(c) Yard W.C. - 1 wall hung basin with cold water tap - 1 shower set with mixer - 1 pedestal water closet - 1 toilet paper holder
(d) Yard and P.E.S. - 1 bib top
(e) Private Roof Terrace - 1 sink
ELECTRICAL INSTALLATION AND TV/TELEPHONE POINT (a) Concealed electrical wiring below false ceiling level. Electrical wiring above false ceiling, and entrance hall closet shall be in exposed conduits or trunking
(b) Two communication outlets (computer and telephone outlets) to Living, Study and Bedrooms with Cat 5e wiring
(c) Please refer to Electrical Schedule
LIGHTNING PROTECTION In compliance with Singapore Standard CP33:1996.
PAINTING (a) Internal walls: Emulsion paint
(b) External walls. Emulsion paint &/or enamel point &/or textured coating point to designated areas
WATERPROOFING Waterproofing to floors of Kitchen, Bathrooms, W.C., Yard, P.E.S., Balcony, Private Roof Terrace and Reinforced Concrete Flat Roof.
RECREATION FACILITIES (a) Water Features and Landscape Gardens
(b) Recreation Pools (i) Main Swimming Pool (ii) Children's Pool (iii) Fun Pool
(c) Outdoor Activity Areas (i) Barbeque Pits (ii) Children's Playground (iii) Tennis Court (1 no.) (iv) Outdoor Fitness Area
(d) Indoor Recreation Facilities (Clubhouse) (i) Reception Area and Multi-Purpose Room (ii) Games Room (iii) Karaoke Room (iv) Steam Rooms (2 nos.) (v) Male and Female changing room
(e) 1 Poolside Gymnasium Pavilion & 2 other Pavilions D
DRIVEWAY AND CARPARK (a) Surface Driveway: Cobble stone &/or interlocking paving blocks to designated areas
(b) Surface Car Park: Perforated concrete &/or interlocking paving blocks
(c) Basement Car Park: Reinforced concrete slab with floor hardener
ADDITIONAL ITEMS (a) Built-in wardrobes to all Bedrooms
(b) High and low level kitchen cabinets, one and half bowl sink, mixer tap, cooker hob, cooker hood and oven
(c) Split-unit wall mounted air-conditioning units to Living/Dining & Bedrooms (Air-conditioning system has to be maintained on a regular basis by Purchaser. This includes cleaning of filters and clearing of condensate pipes at interval of max. 6 monthly to ensure good working condition of the system.)
(d) Power Gas supply to cooker hob and water heater
(e) Hot water supply to all Bathrooms, Kitchen and W.C. shower from central gas water heater
(f) Security Device (i) Auto car barrier with proximity card access at main gate (ii) Proximity card c.ccess to Is? Storey and basement lift lobbies (iii) Telephone intercom system is provided (iv) CCTV to 1st Storey and basement designated areas
NOTES: Marble, Limestone and Granite Marble, limestone and granite are natural materials containing impurities, veins and fissures, all these creates its' natural characteristic colour and tonality differences. There will be colours and markings differences caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity and colour inconsistency in marble, limestone and granite hence cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation. However, granite being a harder material than marble and limestone, cannot be re-polished after installation. Hence, some level differences will be felt at the joints.
Timber Timber are natural materials containing veins with tonality differences. Thus, it is not possible to achieve total consistency of colour and grain in its selection and installation.
Cable readiness Cable readiness outlets to Living and Bedrooms. The Purchaser is liable to pay annual fee, subscription fee and such other fees to the Singapore Coble Vision Ltd (SCV) or any other relevant parties or any other relevant authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective subscription channels.
Reviews
There are no reviews yet.
Be the first to review “Monterey Park Condominium” Cancel reply
Chat With Us Today!
Own your dream property stress-free. We go beyond real estate. Our interior design-trained realtors provide a one-stop shop for all your property needs: buying, selling, renting, and everything in between. We will help you with financing and tax planning, investment analysis and portfolio management, timeline planning and space optimization and even interior design assistance before renting or purchasing the property. Get a free consultation today and let our professionals guide you every step of the way.
Reviews
There are no reviews yet.