FOUNDATION
Bored piles and/or concrete piles and/or steel H piles and/or raft foundation.
SUBSTRUCTURE & SUPERSTRUCTURE
Reinforced concrete framework and/or steel frame.
WALL
External : Common clay bricks and/or precast panel and/or reinforced concrete generally.
Internal : Common clay bricks and/or cement blocks and/or lightweight blocks and/or precast panels and/or reinforced concrete and/or drywall generally
ROOF
Flat Roof
: Reinforced concrete roof with waterproofing and insulation and/or metal roofing with insulation.
CEILING
For Apartments
Living/Dining, Master Bedroom, : Skim coat with emulsion paint generally and plaster board ceiling where Bedroom & Balcony applicable.
Master Bathroom, Bathroom, Powder Room & Kitchen : Plaster board with emulsion paint.
FINISHES
Internal Wall Finishes (For Apartments)
a) Living/Dining, Master Bedroom & Bedroom: Cement and sand plaster and/or skim coat with emulsion paint finish.
b) Master Bathroom, Bathroom, Powder Room & Kitchen: Ceramic and/or homogenous tiles laid up to false ceiling height and on expoed surface only.
c) Balcony & Roof Terrace : Cement and sand plaster and/or skim coat with emulsion paint finish.
Internal Floor Finishes (For Apartments)
a) Living/Dining & Kitchen : Compressed marble with skirting.
b) Master Bedroom & Bedroom : Timber parquet and/or timber strip with timber skirting.
c) Master Bathroom, Bathroom, Powder Room : Ceramic and/or homogenous tiles.
d) Balcony, Roof Terrace & PES (Type C3-G only) : Ceramic and/or homogeneous tiles.
e) A/C Ledges & Planter : Cement and sand screed finish.
WINDOWS
Aluminum framed glass windows.
Note:
a) All aluminum frames shall be powder coated and/or natural anodized finish.
b) All windows are either side hung or top hung or bottom hung or sliding or any combination of the above mentioned.
c) All glazing below 1 m from floor level shall be tempered and/or laminated glass.
d) All glazing to be plain float and/or tinted glass.
DOORS
a) Main Entrance : Approved fire-rated timber door.
b) Master Bedroom, Bedroom, Master Bathroom, Bathroom & Powder Room: Timber door and/or PVC door.
c) Balcony & Roof Terrace,
Note:
a) All aluminum frames shall be powder coated and/or natural anodized finish.
b) Doors can either be of swing and/or sliding and/or bi-fold type with or without fixed glass panel.
c) All glazing to be plain float and/or tinted glass.
IRONMONGERY
Main entrance door, other timber doors and aluminium framed glass door shall be provided with locksets.
SANITARY FITTINGS
a) Master Bath
-1 x Glass shower cubicle c/w shower mixer, overhead shower & shower handset.
-1 x Basin with tap mixer.
-1 x Water closet.
-1 x Toilet roll holder.
-1 x Towel rail.
-1 x Mirror c/w cabinet.
b) Common Bath
-1 x Glass shower cubicle and/or screen c/w shower mixer & shower handset.
-1 x Basin with tap mixer.
-1 x Water closet.
-1 x Toilet roll holder.
-1 x Towel Rail.
-1 x Mirror.
c) Powder Room (For unit type C3-G only)
-1 x Basin with tap mixer.
-1 x Water closet.
-1 x Toilet roll holder.
-1 x Mirror.
d) Kitchen
-1 x Sink c/w sink mixer.
e) Roof Terrace (For penthouse units only)
-1 x Sink c/w tap.
ELECTRICAL INSTALLATION / TV / TELEPHONE
Electrical wiring will be concealed conduits where possible. Where there is a false ceiling, the electrical wiring will be in surface mounted conduit in the ceiling space. Exposed trunking at A/C ledge. The routing of services within the apartment units shall be at the sole discretion of the Architect and Engineer. Cable-Readiness to comply with authorities' requirements.
LIGHTNING PROTECTION
Lightning Protection System shall be provided in accordance with the current edition of Singapore Code of Practice.
WATERPROOFING
Waterproofing to floors of Kitchen, Master Bathroom, Bathroom, Powder Room, Balcony, PES, Terrace, Roof Terrace, Planter, Swimming Pool and Reinforced Concrete Flat Roof.
PAINTING
a) Internal Walls : Emulsion Paint.
b) External Walls : Weather shield paint and/or spray textured coating at selected areas only.
1ST & 2ND STOREY, BASEMENT CAR PARK AND RAMP
Concrete finished with floor hardener and/or perforated concrete slab and/or interlocking pavers and/or aeration slab (where applicable).
RECREATIONAL FACILITIES
Level 1 — Play Space
1) Children's Playground
2) Beach Pool
3) BBQ Pit
4) Reading Corner
5) Jogging Track
6) Water Feature
7) Sentry Post
8) Pavilion
Level 2 — Sky Terrace
1) Fitness Corner
2) Foot Reflexology
3) Outdoor Gym
4) Table Tennis
5) Lounge
6) Function Area
7) Dining Lounge
Level 3 — Environment Deck
1) Lap Pool
2) Pool Deck
3) Pavilion
4) Shower Area
5) Wet Deck
6) Waterscape
Additional Items
a) Wardrobes : Built-in wardrobe in all bedrooms.
b) Kitchen Cabinets
i) Built-in kitchen cabinets with solid surface counter top, cooker hob and cooker hood.
ii) One stainless steel sink c/w sink mixer.
iii) Built-in conventional oven.
c) Air-conditioning to Living/Dining, Master Bedroom & Bedroom.
d) Hot Water Supply to Master Bathroom, Bathroom & Kitchen.
e) Security : Audio intercom system to main door only.
f) Jacuzzi : For penthouse units only.
g) Trellis Lounger: Only main concrete/steel column and beams are provided. Trellis are not provided: (For penthouse units only)
h) Table counter top with one stainless steel sink c/w sink tap and barbecue pit. (For penthouse units only)
Note: --
1) The brand and model of all equipment supplied shall be provided subject to market availability and the sole discretion of the Vendor.
2) Layout/location of wardrobes, kitchen cabinets, fan coil units, electrical points, telephone points and door swing positions are subject to Architect's sole discretion and final design.
3) Connection, subscription and other fees for television, SCV, Internet and other service providers whether chosen by the Purchaser or appointed by the Vendor or the management corporation when constituted will be paid by the Purchaser.
4) Equipment for SCV will be paid and installed by Purchaser.
5) Timber is a natural material containing grain and tonal differences. Thus it is not possible to achieve total consistency of colour and grain in its selection and installation.
6) Marble and granite are natural stone materials containing veins with tonality differences. There will be colour and marking caused by the complex, mineral composition and incorporated impurities. While such material can be pre-selected before installation, this non-conformity cannot be totally avoided. Granite are pre-polished before laying and care has been taken for their installation. However, granite, being a much harder material than marble cannot be re-polished after installation. Hence some difference may be felt at the joints.
7) All doors either be of swing or sliding or bi-fold type.
8) Where warranties are given by the manufacturers and/or contractors and/or suppliers of any of the equipment and/or appliances installed by the Vendor at the Unit, the Vendor shall assign to the Purchaser such warranties at the time when possession of the Unit is delivered to the Purchaser.
9) While every reasonable care has been taken in preparing this website and the plans attached, the developer and its agents cannot be held responsible for any inaccuracies therein. All statements, specifications and plans are believed to be correct but not to be regarded as statements or representations of fact. Visual representations, illustrations, photographs and renderings are intended to portray only impressions of the development and cannot be regarded as representation of facts. Photographs or images contained in this website do not necessarily represent as built standard specifications. All information and specifications are current at the time of press and are subject to change as may be required and cannot form part of an offer or contract. All plans are subject to any amendments approved by the building authorities. Floor areas are approximate measurements and subject to final survey. The choice of brand and model of fittings, equipment, installation and appliances supplied shall be at the sole discretion of the Vendor.
Name of Project: Natura@Hillview Developer: Mequity (Hillview) Pte Ltd (ROC No.: 201017436W) Developers Licence No.: C0891 Tenure of Land: Estate in Fee Simple in respect of Lots 1939P, 1940W, 1941 V, 1942P, 1943T, 1944A, 1948L and 1952C all of Mukim 10 at 18/20/22 Hillview Terrace and 999 years Leasehold commencing from 20 January 1885 in respect of Lot 1998M Mukim 10 at 18/20/22 Hillview Terrace Building Plan No.: A0816-00344-2011-BP01 (Dated: 01 February 2012) Expected Date of TOP: 31 December 2016 Expected Date of Legal Completion: 31 December 2019