Commercial Specifications
1. FOUNDATION
Reinforced concrete pile foundation
2. SUBSTRUCTURE & SUPERSTRUCTURE
Reinforced concrete
3. WALL
a. External — Brick wall and/or reinforced concrete wall
b. Internal — Brick wall and/or reinforced concrete wall
4. ROOF
RC Flat Roof — Reinforced concrete flat roof with appropriate waterproofing system
5. CEILING
a. Shop/Office — Skim coat with paint
b. Toilet — Plaster board ceiling with paint
6. FINISHES
a. Wall
Shop/Office :
-Plaster with paint
Toilet :
-Homogeneous and/or ceramic tiles laid up to false ceiling height and on exposed surface only
External Wall :
-Cement and sand plaster with emulsion paint
b. Floor
Shop/Office :
-Homogeneous and/or cement sand screed
Toilet :
-Homogeneous and/or ceramic tiles
AC Ledges :
-Cement sand screed
7. WINDOWS
Aluminium framed sliding and/or casement with fixed glass panel
8. DOORS
a. Shop Main Entrance
— Glass framed swing door with fixed glass panel
b. Office Main Entrance
— Approved fire-rated timber door c. Toilet — Hollow-core timber door
9. IRONMONGERY
Main entrance door and other hollow-core timber doors shall be provided with lockset
10. SANITARY FITTINGS
a. Shop Toilet (for shop unit #01-01, #01-02 and #01-03)
— 2 water closets
— 2 mirrors
— 2 toilet roll holders
b. Shop Toilet (for shop unit #01-04)
— 1 water closet
— 1 mirror
— 1 toilet roll holder
c. Shop Pantry (for shop unit #01-01, #01-02 and #01-03)
— 2 kitchen sinks
— 2 sink taps
d. Shop Pantry (for shop unit #01-04)
— 1 kitchen sink
— 1 sink tap
e. Office Toilet
— 1 water closet
— 1 mirror
— 1 toilet roll holder
h. Office Pantry
— 1 kitchen sink
— 1 sink tap
11. ELECTRICAL INSTALLATION
All wiring for lighting and power point shall be in concealed conducts except in areas with false ceiling where wiring above false ceiling shall be in exposed conduit
12.TV/ TELEPHONE
Refer to Electrical Schedule for details
13. LIGHTNING PROTECTION
Lightning Protection System shall be provided in accordance with the current Singapore edition of Code of Practice
14. DRIVEWAY
Concrete finish with floor hardener and/or interlocking stone pavers
15. WATERPROOFING
Waterproofing to Toilets, Pantries and AC Ledges
Note:
1. The brand, colour and model of all materials, fittings, equipment, finishes, installations and appliances supplied shall be provided subject to Architect's selection, market availability and the sole discretion of the Vendor.
2. Layout/Location of wardrobes, kitchen cabinets, fan coil units, electrical points, door swing positions and plaster ceiling boards are subject to Architect's sole discretion and final design.
3. To ensure good working condition of the air-conditioning system, the system has to be maintained and cleaned by the Purchaser on a regular basis. This includes the cleaning of filters, clearing the condensate pipes and charging of gas.
4. The Purchaser is liable to pay annual fee, subscription fee and such other fees to the internet service providers (ISP) or any other relevant party or any other relevant authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective subscription channels and/or internet access.
5. If the Purchaser requires internet access, the Purchaser will have to make direct arrangements with the Internet Service Provider and/or such relevant entities/authorities for internet services to the Property/Unit and to make all necessary payments to the Internet Service Provider and/or the relevant entities/authorities.
6. Timber is a natural material containing grain/vein and tonal differences. Thus it is not possible to achieve total consistency of colour and grain in its selection and installation.
7. Granite is a natural stone material containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity in the granite as well as non-uniformity between pieces cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation and cannot be re-polished after installation. Hence some differences may be felt at the joints. The tonality and pattern of the granite selected and installed shall be subject to availability.
8. All aluminium frames shall be powder coated finish. All casement windows are either side hung, top hung or bottom hung or any combination of the mentioned.
9. Cyclical Maintenance:
a. Gondola supports/brackets and/or metal platforms (collectively 'gondolas') (if and if applicable) may be provided at the external wall, planter, air-con ledge, roof terrace, PES, swimming pool or balcony of some of the Units for the installation of gondolas.
b.The Purchaser shall allow access to and facilitate space for the Vendor and the management corporation (when formed) in relation to the matters mentioned in sub-clause 1(a) of Schedule A for the purposes of carrying out cyclical maintenance, repair, upkeep and cleaning work to the building facade of the Housing Project.
Residential Specifications
1. FOUNDATION
Reinforced concrete pile foundation
2. SUBSTRUCTURE & SUPERSTRUCTURE
Reinforced concrete
3. WALL
a. External — Brick wall and/or reinforced concrete wall
b. Internal — Brick wall and/or reinforced concrete wall
4. ROOF
RC Flat Roof — Reinforced concrete flat roof with appropriate waterproofing system
5. CEILING
a. Living/Dining, Master Bedroom and Bedroom
— Skim coat with paint
b. Master Bathroom and Bathroom
— Plaster board ceiling with paint
c. Balcony and Household Shelter
— Skim coat with paint
6. FINISHES
a. Wall
Living/Dining, Master Bedroom and Bedroom:
-Plaster with emulsion paint
Master Bathroom, Bathroom and Kitchen:
-Homogeneous and/or ceramic tiles laid up to false ceiling height and on exposed surface only
Balcony and Roof Terrace (where applicable):
-Plaster and/or skim coat with paint
Household Shelter:
-Skim coat with emulsion paint
b. Floor
Living/Dining, Master Bedroom, Bedroom and Kitchen:
-Timber Flooring
Master Bathroom and Bathroom:
-Homogeneous and/or ceramic tiles
Balcony and AC Ledges (where applicable):
-Homogeneous and/or ceramic tiles
Roof Terrace and PES (where applicable):
-Timber flooring and/or granite tiles
7. WINDOWS
Aluminium framed sliding and/or casement with or without fixed glass panel
8. DOORS
a. Main Entrance
— Approved fire-rated timber door
b. Master Bedroom, Bedroom, Master Bathroom and Bathroom
— Hollow-core timber door
c. Balcony, AC Ledge and Roof Terrace (where applicable)
— Aluminium framed sliding door and/or swing door with or without fixed glass panel
9. IRONMONGERY
Main entrance door and other hollow-core timber doors shall be provided with lockset
10. SANITARY FITTINGS
a. Master Bathroom
-1 shower set and rain shower
-1 basin and mixer tap
-1 water closet
-1 mirror
-1 toilet roll holder
b. Bathroom
-1 shower set
-1 basin and mixer tap
-1 water closet
-1 mirror
-1 toilet roll holder
c. Kitchen
-1 kitchen sink
-1 sink tap
d. Roof Terrace and PES (where applicable)
-1 bib tap
11. ELECTRICAL INSTALLATION
All wiring for lighting and power point shall be in concealed conducts except in areas with false ceiling where wiring above false ceiling shall be in exposed conduit
12. TV/ TELEPHONE
Refer to Electrical Schedule for details
13. LIGHTNING PROTECTION
Lightning Protection System shall be provided in accordance with the current Singapore's edition of Code of Practice
14. DRIVEWAY
Concrete finished with floor hardener and/or interlocking stone pavers
15. WATERPROOFING
Waterproofing to floors of Bathroom, Kitchen, Balcony, Roof Terrace/Open Balcony, PES, RC Flat Root AC Ledge & Planter and Swimming Pool
16. RECREATIONAL FACILITIES
a. Swimming Pool and Hydrotherapy Spa
b. Pool Deck
c. Gym
d. Barbeque Area
17. ADDITIONAL ITEMS
a. Built-in sofa and pull-out table for living/dining
b. Built-in wardrobe for master bedroom and bedroom
c. Built-in kitchen cabinets with sink, cooker hob and cooker hood
d. Air-conditioning to living/dining, master bedroom and bedroom
e. Hot water supply to master bathroom and bathroom
f. Audio intercom system
g. Card access for the residential lift lobby
h. Refrigerator, microwave oven and washing machine-cum-dryer
Note
1. The brand, colour and model of all materials, fittings, equipment, finishes, installations and appliances supplied shall be provided subject to Architect's selection, market availability and the sole discretion of the Vendor.
2. Layout/Location of wardrobes, kitchen cabinets, fan coil units, electrical points, door swing positions and plaster ceiling boards are subject to Architect's sole discretion and final design.
3. To ensure good working condition of the air-conditioning system, the system has to be maintained and cleaned by the Purchaser on a regular basis. This includes the cleaning of filters, clearing the condensate pipes and charging of gas.
4. The Purchaser is liable to pay annual fee, subscription fee and such other fees to the Internet service providers (ISP) or any other relevant party or any other relevant authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective subscription channels and/or internet access.
5. If the Purchaser requires internet access, the Purchaser will have to make direct arrangements with the Internet Service Provider and/or such relevant entities/authorities for internet services to the Property/Unit and to make all necessary payments to the Internet Service Provider and/or the relevant entities/authorities.
6. Timber is a natural material containing grain/vein and tonal differences. Thus it is not possible to achieve total consistency of colour and grain in its selection and installation.
7. Granite is a natural stone material containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity in the granite as well as non-uniformity between pieces cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation and cannot be re-polished after installation. Hence some differences may be felt at the joints. The tonality and pattern of the granite selected and installed shall be subject to availability.
8. All aluminium frames shall be powder coated finish. All casement windows are either side hung, top hung or bottom hung or any combination of the mentioned.
9. Cyclical Maintenance: a. Gondola supports/brackets and/or metal platforms (collectively 'gondolas') (if and if applicable) may be provided at the external wall, planter, air-con ledge, roof terrace, PES, swimming pool or balcony of some of the Units for the installation of gondolas.
10.The Purchaser shall allow access to and facilitate space for the Vendor and the management corporation (when formed) in relation to the matters mentioned in sub-clause 1(a) of Schedule A for the purposes of carrying out cyclical maintenance, repair, upkeep and cleaning work to the building facade of the Housing Project.
Whilst every reasonable care has been taken in preparing this website, the developer and its agents cannot be held responsible for any inaccuracies • All statements are believed to be correct but are not to be regarded as statements of representation of facts • All information and specifications are current at the time of going to the press and are subject to change as may be required and cannot form part of an offer or contract • All plans are subject to any amendments approved or may be approved by relevant authorities • All plans shown in this website are not to scale • All art renderings and illustrations contained in this website are artist's impressions only and photographs are only deco suggestions and none can be regarded as representation of fact • Floor areas are approximate measurements and subject to final survey.