ACCESSIBILITY
• Easy access to Pan-Island Expressway and East Coast Parkway
• Walking distance to Expo MRT station and 20 minutes’ drive to Central Business District
• Changi Business Park (CBP) is served by public bus service nos. 20, 47, 117, 118 and private buses to various estates in Singapore
• Sheltered pedestrian walkways connecting buildings in the CBP
Shuttle Bus Services
• Subsidised JTC shuttle bus services to and from:
- Expo and Tanah Merah MRT stations
- Tampines MRT station & Bedok Central (during lunch hours)
BUILDING SPECIFICATIONS
Type of Building
• 9-storey business park space with flexible unit layouts and sky terrace garden on the 3rd, 5th and 7th storeys
• BCA Green Mark GoldPlus Award
• Green features: Extensive greenery, high efficiency chiller, motion-sensor lightings, high eco-friendly interior fittings and materials, waste data digitalisation project and recycling corner
Floor Area
• Total NLA: Approx. 61,980 sqm
Typical Floor Plate
• 1st & 2nd storey: Approx. 3,660 sqm
• 3rd - 8th storey: Approx. 7,981 sqm
• 9th storey: Approx. 4,377 sqm
Floor Loading
• Basement: 2.5 kN/sqm
• 1st - 8th storey: 5.0 kN/sqm
• 9th storey:
5.0 kN/sqm for Business Park Space
5.0 - 7.5 kN/sqm for M&E Space
Ceiling Height
• Floor to false ceiling
- 1st storey: 4.2 m
- 2nd - 9th storey: 2.8 m (raised floor to false ceiling)
• Floor to floor
- 1st storey: 6.0 m
- 2nd - 9th storey: 4.5 m
Column Grid
• Approx. 8.4 m x 18 m
Lifts
• Passenger lifts: 8 x 1,630 kg (24 persons) at each tower
• Carpark lifts: 2 x 1,020 kg (15 persons) at each tower
• Service lift: 1 x 3,000 kg at each tower
- Dimension: 2.2 m (W) x 2.6 m (D) x 2.6 m (H)
- Lift car door size: 2.0 m (W) x 2.6 m (H)
Loading Bay Facilities
• 3 loading/unloading bays with dock levellers
Parking Lots
• Car: Approx. 285
• Lorry: Approx. 6
• Motorcycle: Approx. 81
• Parking allocation: 1 lot per 250 sqm leased
Air-Conditioning System
• Centralised water-cooled chilled water system
• Air-con provided from Mon to Fri (8am - 6pm) except Public Holidays
Air-Conditioning charges
• $44 per AHU/hr outside standard operating hours (minimum 2 AHUs)
• Chilled water supply is available (subject to terms & conditions)
Power Supply Allocation
• Approx. 150 watts or 0.25 amps per sqm of lettable area (3-Phase)
Provisions
• Ceiling board, lighting and raised flooring
Amenities
• Changi City Point: 20,000 sqm of retail and dining offerings
• Hotels/Service Residences: Park Avenue Changi Hotel and Capri by Fraser
• Other amenities within CBP: convention centre, clinics, childcare centres, supermarkets and etc