1. Foundation
Precast concrete pile.
2. Superstructure
Reinforced concrete using Grade 30 concrete manufactured from Portland Cement complying with SS26, steel reinforcement bar complying with SS2.
3. Walls
a) External Wall — Clay Brickwall.
b) Internal Wall — Clay Brickwall or block wall.
4. Roof
a) Pitch Roof
i) Clay tiles on tanalised timber battens.
ii) Tanalised timber truss rafters.
b) Flat Roof
Reinforced concrete roof with waterproofing membrane and insulation.
5. Ceiling
Gypsum plaster ceiling to bathrooms, WC & kitchens. Cement plastered & emulsion painted on concrete ceiling to all other parts of the apartment.
6. Finishes
a) Walls i) Internal Walls
Living, Dining, Bedrooms, Study, Utility Room, Store, Yard & Balcony
— Plaster & painted.
Kitchen, Bathrooms, WC
— Ceramic tiles to exposed wall up to false ceiling level.
Lift Lobbies & Passageways
— Plaster & painted.
ii) External Walls
— Plaster with acrylic textured coating.
b) Floor
i) Internal Floor Finishes
Living, Dining, Bathrooms, Kitchen, Utility Room, Store, Yard , Balcony & WC
— Ceramic tiles.
Bedrooms
— Timber parquet.
ii) External Floor Finishes
Lift Lobbies, Passageways
— Homogeneous tiles.
Pool-deck, External Walkways, Barbecue area
— Slate tiles.
7. Windows
a) Living, Bedrooms, & Type A Kitchen
— Anodised aluminium framed sliding windows.
Bathroom/WC
— Anodised aluminium framed top-hung windows.
Kitchen (except Type A) & Utility Room
— Anodised aluminium framed adjustable louvred window.
b) Glass
6mm thick tinted glass.
8. Doors
a) Main Entrance
— Solid timber door.
Living/Balcony
— Anodised aluminium framed sliding door with 6mm thick tinted glass.
Bedrooms, Study, Kitchen, Utility & Bathrooms
— Timber ply hollow core flush door.
Store
— Timber louvred door.
b) Locksets
— NARA, SCHLAGE, KWIKSET, HARLOC or equivalent.
9. Sanitary Fittings
Master Bathroom (Bath 1)
— 1 basin, 1 water closet, 1 longbath, 1 soap holder, 1 paper holder, 1 mirror, & 1 towel rail.
Common Bathroom (Bath 2)
— 1 basin, 1 water closet, 1 shower point, 1 soap holder, 1 paper holder, 1 mirror & 1 towel rail.
Yard (WC)
— 1 basin, 1 water closet, 1 bib tap point. & 1 paper holder.
10. Electrical Installation
a) Concealed Wiring
11. TV/FM/Telephone
Each apartment unit has 2 nos. TV/FM outlets and 2 nos. telephone points.
12. Lighting Protection
Lighting protection system shall be provided in accordance with Singapore Standard CP 33 (1985).
13. Painting
a) Emulsion paints for all internal walls/ceiling.
b) Acrylic textured coating for external walls.
14. Water Proofing
Water proofing to basement floor slab, first storey deck, flat roof, bathroom, kitchen, balcony and yard floor.
15. Driveway & Car Park
External Driveway
- Bitumen Premix
External Carparks
- Bitumen Premix and/or perforated concrets slabs .
1st Storey Car Park
— Reinforced concrete with hardener.
Basement. Driveway & Car Park.
- Reinforced concrete with hardener.
16. Recreation Facilities
a) Swimming Pool & Wading Pool
b) 1 Tennis Court
c) 1 Squash Court
d) Male & Female Sauna
e) Barbecue Area 0 Children Play Area
17. Additional Items
a) Kitchen Cabinet
Particle board with melamine laminate provided with sink, gas hob, exhaust hood and oven.
b) Bedroom Wardrobe
Particle board with melamine laminate.
c) Air Conditioners
Wall hung exposed split-unit system for all bedrooms.
d) Electrical water storage heater provided to all bathrooms and kitchen.
CONSULTANTS
Architect : AMS CONSULTANTS
Structural Engineer : TAN EE PING & PARTNERS
Mechanical & Electrical Engineer : Y P CHEE & ASSOCIATES
Quantity Surveyor : DAVIS LANGDON & SEAH
PROJECT DETAILS
Developer : CITY DEVELOPMENTS LIMITED
Tenure of Land : FREEHOLD (FREE FROM ENCUMBRANCES UPON COMPLETION)
Lot/Mukim : LOTS 905, 4187 MK17 AT BALESTIER ROAD
Planning Approval No : DC 590/72 PT3 (90/CR/747)
Building Plan Approval : BP 6003/92
Expected TOP Date: 31st DECEMBER 1995
Expected Date of : 31st DECEMBER 1999 Legal Completion
Developer's Licence No: B0162