FOUNDATION
Cast-in-situ grade C35 concrete bored piles and pilecaps complying with BS8004 to Engineer's design.
SUPERSTRUCTURE
i) Reinforced concrete using grade C35 concrete for podium, reinforced concrete structures and grade 30 concrete for other reinforced concrete structures complying with BS81110.
ii) Steel reinforcing bars complying with SS2 and BS4449.
WALLS
a) External: Reinforced concrete walls/columns and clay brickwalls infill.
b) Internal Reinforced concrete walls/columns and clay brickwalls infill.
ROOF
a) Pitched Roof: Metal trellis feature roof.
b) Flat Roof: Reinforced concrete flat roof with waterproofing membrane and insulation.
CEILING
a) Fibrous plaster board ceiling to kitchens and bathrooms.
b) Cement plaster and paint on concrete ceiling to other parts of the apartment
FINISHES
a) Walls
i) Internal Walls:
Cement plaster and paint to living, dining, bedrooms, utility, yard, corridor and store. Ceramic tiles to false ceiling height to exposed areas of kitchen and bathrooms and wc. Marble to false ceiling height to exposed area of master bathroom.
ii) External Walls:
Cement and sand plaster, with textured/non-textured coating.
b) Floor
i) Internal Floor Finishes:
Marble to living, dining, master bathroom. Laminated floorboard with timber finish to bedrooms. Homogeneous tiles to store, yard, utility, w.c. and balcony. Ceramic tiles to kitchen and bathrooms.
ii) External Floor Finishes:
Granite to 1st storey and basement lift lobby. Homogeneous tiles to other lift lobbies. Homogeneous or ceramic tiles to clubhouse generally. Slate tiles to swimming pool deck.
Cement and sand screed to M & E plant rooms.
Concrete with hardener to basement caipark.
WINDOWS
a) Powder coated aluminium framed sliding, top hung, or casement windows to living and bedrooms. Powder coated aluminium framed top hung or sliding windows to bathrooms, utility, kitchen and w.c.
b) Glass - tinted float glass generally. Obscure glass for bathrooms and w.c.
DOORS
a) Solid timber door to main entrance door and kitchen door leading to lift lobby. Timber flush doors to bedrooms, bathroom, utility, store, w.c. and kitchen door leading to yard. Timber flush door with glass panel to kitchen door leading to dining area.
b) Powder coated aluminium framed sliding doors living with balcony (for unit types A2, B3, B4, CS, C7, C9, C10, C11, C12, DS, D6, D7 and 08) Glass - tinted float glass.
c) Locks - any of the following brands:- Goal, Showa, Kwikset, Tesa, Delta or equivalent locksets.
SANITARY FITTING
a) Master bath -1 vanity basin, 1 water closet, 1 long bath, 1 shower area with shower screen and door (except unit types C1, C1-1, C2, C2-1, C3, C3-1, C5, C7 & C9),1 soap holder, 1 paper holder and 1 towel rail.
b) Bathroom 2 (for unit types A1, A1-1, A1-2 & A2)1 vanity basin, 1 water closet, 1 long bath,1 soap holder, 1 paper holder and 1 towel rail.
c) Common bath - 1 vanity basin, 1 water closet, 1 shower area with shower screen and door, 1 soap holder, 1 paper holder and 1 towel
d) W.C. -1 wash basin, 1 shower point, 1 water closet and 1 paper holder.
e) Kitchen - acrylic silica sink.
TV/FM/TELEPHONE
1 TV/FM point at living and master bedoom.
1 telephone point at living and all bedrooms.
LIGHTNING
All apartment blocks are provided with lightning protection PROTECTION system which has been designed in accordance with Singapore Standard CP33:1985.
PAINTING
Internal Walls
- emulsion paint to all internal walls.
External Walls
- textured/non-textured paint coating.
WATERPROOFING
Waterproofing to basement floor and wall, r.c. flat roof, 1st storey garden deck, bathroom, yard, kitchen, wc., balcony floor and planter box.
DRIVEWAY & CARPARK
Concrete block paving to driveways, perforated slabs finish to open surface carparks. Concrete floor with hardener to basement carparks.
RECREATION FACILITIES
a) 2 Swimming Pods
1 Children's Wading Pool
2 Bubble Pools
b) 3 Tennis Courts
c) Clubhouse with :
2 Squash Courts
Function Room
Gymnasium Room
Terrace Lounge
Games Room
Sauna - Male & Female
Management Office
d) Landscaping
e) Children's Playground
f) BBQ Areas
ADDITIONAL
a) Kitchen Cabinets - high and low Kitchen cabinets with laminate finish and polyester acrylic component counter top.
b) Bedroom Wardrobes - wardrobes with veneer finish
c) Air-conditioners - wall hung split air-conditioning system with individual control in bedrooms, living and dining.
d) Appliances - a cooker hob, a cooker hood, built-in oven to kitchen. Storage water heater with hot water supply pipework to bathrooms and kitchen
e) Audio intercom system
CONSULTANTS
Architect :APCO Architects & Town Planners Collaborative
Design Consultant Kiat Inc.
Structural Engineer : KTP Consultants
M & E Engineer : Parsons Brinckerhoff Consultants Pte Ltd
Quantity Surveyor : KPK Quantity Surveyors
Landscape Architect : Peridian Asia Pte Ltd
Interior Designer : KKS Consultants & Designers Pte Ltd
Project Management City Project Management Pte Ltd
PROJECT DETAILS
Developer : City Developments Ltd
Tenure of land Freehold
Lot/TS :21,22 & 2353 Mk5
Planning Approval No. : DC 492/54 Pt(93/W/0433)
Building Plan Approval No. : 2054/94
Developers Licence No. : B0641
Expected TOP Date :
Phase One 30 September 1998
Phase Two 31 December 1998
Phase Three-31 December 1998
Expected Date of Legal Completion:
Phase One 30 September 2002
Phase Two - 31 December 2002
Phase Three 31 December 2002