Smart Food @ Mandai
SGD$2,502,000
Developer: Smartisan Realty Pte Ltd
Site Area: 65,165 sqft
No. Of Units: 84 Factory Units + 1 Canteen
Tenure: Freehold
District: 25
Vacant Possession: TBC
Unit Types:
Canteen: 6265 sqft (from $8,872,826)
Factory: 1776 to 16663 sqft (from $2,502,000)
Factory + Mezzanine: 3100 to 5156 sqft (from $4,059,783)
Floor Plans
Smart Food @ Mandai Level 1 Full Floor Plate Floor Plan
Smart Food @ Mandai Level 1 Mezzanine Full Floor Plate Floor Plan
Smart Food @ Mandai Level 2 Full Floor Plate Floor Plan
Smart Food @ Mandai Level 5 Full Floor Plate Floor Plan
Smart Food @ Mandai Level 3, 6, 8, 9 Full Floor Plate Floor Plan
Smart Food @ Mandai Level 4, 7 Full Floor Plate Floor Plan
Smart Food @ Mandai Level 10 Full Floor Plate Floor Plan
Specifications
FOUNDATION
Reinforced concrete piling foundations system and / or any approved foundation system.
STRUCTURE
Reinforced concrete structures (cast in-situ and/or precast structures / post-tensioning beam and slabs/flat slabs) and structural steelwork to Structural Engineer’s detail and/ or design.
ROOF
Post-tensioned reinforced concrete roof / cast in-situ and/or precast reinforced concrete roof with waterproofing / metal roof where applicable.
WALL AND FINISHES
External : Reinforced concrete walls / clay brick walls with cement and sand plastering / lightweight concrete walls / composite walls / skim coating / plaster with external emulsion paint finish / plaster & spray texture coating finish, where applicable.
Internal (Factory) : Reinforced concrete walls / clay brick walls with cement and sand plastering / block walls / fire-rated wall panels / precast lightweight concrete panels /composite walls / skim coating with paint finish / painting / No wall finishes will be provided above false ceiling at designated area
Internal (Toilet) : Cement and sand plastering / skim coating / painting / tile finishes / No wall finishes will be provided above false ceiling at designated area
Lift Lobbies : Anti-fingerprint, scratch resistance laminate and / or tile finishes.
FLOOR FINISHES
Factory / Canteen : Power-trowelled concrete floor with non-metallic floor hardener
Lift Lobbies : Slip Resistant heavy-duty homogeneous finishes.
Toilet Areas/ Bin Centre : Slip-resistant homogeneous tile finishes with waterproofing, where applicable.
Staircase : Cement sand screed with nosing tiles
External Staircase : Perforated GI metal with weatherproof enamel paint finish, to structural engineer’s details
Landscape Roof Deck : Slip Resistant homogeneous tile, to landscape designer’s details
Driveway/ carpark/Loading & unloading : Power-trowelled concrete floor with hardener
Ramp-up structure : Power-trowelled concrete floor with line-imprints
CEILING FINISHES
Factory Unit : Generally skim coating / emulsion paint / off-form concrete finish, except for lift lobbies, toilets, complete with gypsum plaster ceiling and/or calcium silicate board suspended ceiling
Lobbies : Aluminium Powder Coated Strips with LED lights inserted on 1st storey lift lobbies, where applicable.
DOORS
Roller shutter / timber and / or metal doors and / or PVC doors in accordance with statutory requirements, where applicable.
WINDOWS
Glass panel / double-glazed panels / Powder-coated aluminium-framed glass windows / obscure windows with tinted and/or clear glass where appropriate / Glass specifications to comply with ETTV/heat-strengthened glazing.
FLOOR LOADING
1st Storey fire engine driveway : 16kN/m2
1st Storey internal driveway : 12.5kN/m2
1st Storey factory units : 20kN/m2
Canteen : 12.5kN/m2
1st Storey mezzanine : 5kN/m2
2nd to 10th Storey factory / carpark / driveway / ramp : 12.5kN/m2
Metal roof : 1.5kN/m2
Reinforced concrete roof : 1.5kN/m2
FLOOR-TO-FLOOR HEIGHT
1st storey : 7.0m (mezzanine level 3.5m)
2nd to 9th storey : 5.95m
10th storey : 6.10m – 7.0m
ELECTRICAL INSTALLATION
Each unit will be provided with an isolator only. Purchasers to apply and provide their own meter board, distribution board for their outgoing power inclusive of AC use, power and lighting installations to suit their requirements. Meter board will only be provided to units with electrical provision 100A and above.
Isolators will be provided for roller shutters and mechanical ventilation systems.
Emergency lighting including “EXIT” signs to all factory units will be provided in compliance with statutory requirements. Purchaser to provide cabling from unit DB to these provisions.
No lighting points and fittings will be provided for all factory units. Lighting will be provided to common areas such as staircases, driveway, ramps, lift lobby only.
Individual electrical meter compartments will be provided for each factory unit and canteen unit.
LIGHTNING PROTECTION SYSTEM
Lightning protection system will be provided in compliance with statutory requirements.
TELECOMMUNICATION
Space & Infrastructure for telecommunication system will be provided in compliance with statutory requirement.
Only 2-way air-blown fibre microducts are provided from the telecom riser to each factory unit and canteen unit. Purchasers to make own application to a service provider and provide their telephone point(s) and cablings.
No data/SCV provided.
Purchasers are to liaise with the service providers for their own info-communication requirements. Cable trays are provided from Telecommunication riser to each unit’s entrance.
AIR-CONDITIONING AND MECHANICAL VENTILATION SYSTEM
Provision of air-con ledge.
Mechanical ventilation in compliance with authority requirements on designated areas.
Engineered smoke control systems will be provided in compliance with statutory requirements in designated areas.
An air-conditioning system will be provided for the Fire command centre (FCC) and 1st storey lift lobbies.
FIRE PROTECTION SYSTEM
Sprinklers, fire alarms, dry risers, hose reel systems, fire extinguishers, voice communication systems, emergency lighting, and exit signs are provided in compliance with statutory requirements.
PLUMBING AND SANITARY SYSTEM
Sanitary and plumbing installation systems are provided in compliance with statutory requirements
Accessible toilets in compliance with statutory requirements
Units: 1 water closet; 1 wall-hung wash basin with mixer tap; 1 bidet spray
Individual water meter compartments will be provided for each factory unit and canteen unit.
LIFT SERVICES
2 nos of passenger lifts/Fire lifts and 2 nos of service lift provision.
Gas Supply
Provision of Gas Pipe is provided with cap off inside the unit.
PA System
Voice Communication system provided in compliance with statutory requirements;
Speaker(s) will be provided in compliance with statutory requirements.
WATERPROOFING
Waterproofing shall be provided to all slabs subjected to water penetration, internal wet areas (e.g., toilets, Bin Rooms and Bin Centre).
LOADING BAY & AREA
Two (2) number of loading and unloading bays at 1st storey, 3m wide and 7.5m length common lorry parking lots in front of Production units 05, 06 & 07 at 1st storey; common loading/unloading area or common carparks at 2nd to 10th storey.
WASTE DISPOSAL SYSTEM
Each unit will have a designated waste collection point within the unit and unit owners will engage their own licensed waste collector to collect and dispose of the food waste directly from their units using the vehicle ramp and designated lift.

























Reviews
There are no reviews yet.