Space 21

Developer: JVA Katong Pte Ltd
No. Of Units: 19 Production Units + 1 Industrial Canteen
Site Area: 1427.4 sqm (15,364 sqft)
Tenure: Freehold
District: 19
TOP: 30-Jun-2023
Unit Types:
Production Units: 2433 to 2508 sqft (19 Units)
Canteen: 1701 sqft (1 Units)

Category:

About Space 21

Space 21, Where People And Space Ideally Connected 

Space 21 and decreasing FREEHOLD B1 Industrial
Building with one inclusive block of 5-storey industrial factory, total 19 units and 1 canteen at first floor.

It is located in District 14, Geylang and Sims area, and at the eastern fringe of the Central Region of Singapore, a great long term property asset suitable for either investment or own use.

Development Insights
Freehold
Strategically Located Near
Aljunied Mrt(Ew9) And Business Hubs
Island-wide Connectivity
Close Proximity To Malls And Eateries
Sheltered Carpark Space
High Ceiling Height
District 14

Attractions Of Space 21

Rare freehold B1 Industrial property.

Convenient location in D14, the fringe of Central Region of Singapore, near to CBD and the vibrant Paya Lebar Business Hub.

Doorstep to Aljunied MRT Station with only approximately 5 minutes walking distance, in line with government’ s car-lite initiatives for employees.

Strategically located in the central area and easily accessible island-wide via PIE, KPE and ECP.

Excellent investment opportunity without Additional Buyer ’s Stamp Duty (ABSD).

Close proximity to multiple varieties of famous eateries, hawker centres and canteens in the Aljunied and vibrant Geylang vicinities.

High ceiling with floor-to-floor Height of 7m. Dual key concept to give more flexibility to your choice.

Each unit with attached toilet facilities

Space 21 Location Map

Space 21 Street View

Space 21 Resale/Rental Prices






Site Map & Floor Plans

Space 21 Site Map



Space 21 Diagrammatic Chart



Space 21 1st Storey Floor Plans



Space 21 2nd Storey Floor Plans



Space 21 3rd Storey Floor Plans



Space 21 4th Storey Floor Plans



Space 21 5th Storey Floor Plans

Specifications

Foundation
Generally reinforced concrete bored pile foundation

Structure
Cast in-Situ reinforced concrete frame

Roof
Reinforced concrete flat Rrof with appropriate waterproofing and insulation system and metal roofing over the factory units

Internal Wall
Generally lightweight concrete panel/block wall/ impact-resistant drywall with skim coat and emulsion paint
Homogenous wall tiles to toilets to 2400mm height and emulsion paint on skim coat above 2400mm height.
Homogeneous wall tile to lift lobbies

External Wall
Reinforced concrete/lightweight concrete panel/block wall where appropriate with skim coat and painting.

Floor Loading
Factory floor:7.5kN/m2
Mezzanine floor: 3.0KN/m2

Floor to Floor Height
1st storey: 5.185m
2nd to 5th storey: 7.0m

Windows
Aluminum-framed glazing / Aluminum louvres/ Aluminum-framed window system with glazing

Doors
Approved timber door with quality lockset to main entrance of units
Slide and fold PVC door with lockset to toilets
Glazing at 1st storey where applicable

Ceiling
Units: Skim coat and emulsion paint finish
Toilets: Suspended ceiling
Common areas: Plaster and emulsion paint finish/suspended ceiling

Floor Finishes
Generally power float concrete floor to all areas except lift lobbies and toilets
Homogeneous tile to lift lobbies, common corridor and toilets

Electrical Supply
60A 3Phase Isolator provided to individual unit
KWH Meter located inside the common electrical riser

Gas Supply
There is no gas provision to the building

Fire Protection
Sprinkler, fire alarm , dry risers, hose reel systems, fire extinguishers, voice communication systems, emergency lighting, exit signs are provided in compliance with statutory requirements

Air Conditioning/Mechanical
Provision of air conditioning to lift lobbies
Mechanical ventilation in compliance to authority requirements for designated areas

Lifts
1 service lift and 1 passenger/fire lift

Plumbing and Sanitary
Accessible toilets in compliance with statutory requirements
Units: 1 water closet; 1 wall-hung wash basin with mixer tap; 1 bidet spray; 1 toilet paper holder
Sanitary and plumbing installation systems are provided in compliance with Government Authority requirements
Piping works from meter compartment to unit with cap off at unit entrance

Telecommunication
Infrastructure( cable tray and/or trunking and/or conduit) for telecommunication is provided in compliance with IDA requirements

Lightning Protection
Lightning Protection System provided in compliance with statutory requirements

PA System
Voice Communication system provided in compliance with statutory requirements;
2 speakers provided per individual unit;

Loading Bays
2 loading bays at 1st storey

Car Parks
6 car spaces inclusive of accessible lot for disabled at 1st storey

Refuse Disposal
One common bin point at 1st storey

E-Brochure

Space 21 E-Brochure