1. FOUNDATION
Reinforced concrete bored piles and/or Reinforced concrete footings and/or Driven piles.
2. SUPERSTRUCTURE
Reinforced concrete and/or Pre-Stress concrete and/or precast reinforced concrete and/or Structural steel to Engineer's design and specification.
3. WALLS
a) External Wall:
-Reinforced concrete and/or light weight concrete panel and/masonry walls and/or curtain wall system.
b) Internal Wall:
-Reinforced concrete wall and/or light weight concrete panel/blocks and/or pre-cast reinforced concrete wall and/or masonry walls and/or drywall partition system.
4. ROOF
a) Reinforced concrete flat roof with appropriate waterproofing and insulation roofing system.
b) Metal Roof : metal roof with appropriate insulation
5. CEILING
Refer to Ceiling Height Schedule for the floor to ceiling height in the Unit
i) Apartment Unit
a) Living/Dining/Bedrooms/Hallway to Bedroom/Balcony
- Skim coat and/or plaster ceiling board and/or bulkhead to designated area with paint finish (where applicable)
b) Kitchen/Master Bathroom/Junior Master Bathroom/Common Bathroom/WC
- Plaster ceiling board/or bulkhead to designated area (where applicable)
ii) Common area
a) Lift Lobbies/Corridors/Gymnasium/Handicap Toilet/Multi-Purpose Room
- Plaster ceiling board and/or skim coat and/or bulkhead to designated area with paint finish (where applicable)
b) Car park/Ramp/Staircase and Landing
- Skim coat and/or bulkhead to designated area with paint finish (where applicable)
6. FINISHES
(a) Wall
i) Apartment Unit
Living/Dining/Bedrooms/Hallway to Bedrooms
-Cement and sand plaster and/or skim coat with paint finish (up to false ceiling or at exposed surface only)
Master Bathroom/Junior Master Bathroom
-Composite Marble or Compressed Marble (up to false ceiling height where applicable and no composite marble or compressed marble behind vanity cabinets and mirror where applicable)
Common Bathroom
-Tiles (up to false ceiling height where applicable and no tiles behind vanity cabinets and mirror where applicable)
Kitchen
-Tiles (up to false ceiling height where applicable and no tiles behind kitchen cabinets where applicable) and/or cement and sand plaster finish and/or skim coat with paint finish (up to false ceiling height where applicable)
Toilet or WC (where applicable)
-Tiles (up to false ceiling height where applicable and no tiles behind mirror where applicable) and/or cement and sand plaster finish and/or skim coat with paint finish (up to false ceiling height where applicable)
Balcony
-Cement and sand plaster and/or skim coat with paint finish (where applicable)
Utility room
-Cement and sand plaster and/or skim coat with paint finish (where applicable)
ii) Common Area
Main Lift lobby (Basement 1 & 2 and 1st storey)
-Stones and/or Tiles and/or cement and sand plaster and/or skim coat with paint finish
Typical Floor Lift lobby (2nd to 30th storey)
-Cement and sand plaster and/or skim coat with paint finish
Common Corridor/Staircase and Carpark
-Cement and sand plaster and/or skim coat with paint finish
All external walls including Balcony
-Cement and sand plaster with spray textured and/or paint finishes
(b) Floor
i) Apartment Unit
Living/Dining/Kitchen/Hallway to Bedrooms/Study Corner (where applicable)
-Compressed Marble with skirting
Master Bathroom/Junior Master Bathrooms
-Composite Marble or Compressed Marble
Common Bathroom/WC
-Tiles
Bedrooms
-Timber and/or Engineered timber-strips with skirting. - Balcony Tiles
Utility room (where applicable)
-Tiles with skirting
Air Con Ledge
-Cement and sand screed
ii) Common Area Main Lift lobby (Basement 1 & 2 and 1st storey)
-Stones and/or Tiles
Typical Floor Lift lobby (2nd to 30th storey)
-Tiles
Common Corridor
-Tiles and/or cement and sand screed
Staircase
-Cement and sand screed
7. WINDOWS
All windows of the units shall be powder coated finish aluminum frame with tinted and/or clear glass and/or frosted glass where appropriate to Architect's design and specification
8. DOORS
Main Entrance
-Approved fire-rated timber door complete with approved ironmongeries to Architect's design and specification
Bedrooms/Bathrooms
-Hollow core timber swing door and/or sliding door complete with approved ironmongeries to Architect's design and specification
Kitchen
-Timber and/or aluminum framed/frameless glass sliding door and/or swing door and/or pocket door and /or slide and fold door complete with approved ironmongeries to Architect's design and specification (where applicable)
WC
-Swing door and/or slide and fold door complete with approved ironmongeries to Architect's design and specification (where applicable)
Balcony
-Aluminum framed sliding and/or swing door and/or slide and fold door complete with approved ironmongeries to Architect's design and specification
9. SANITARY FITTINGS
i) Master and Junior Master Bathrooms
-One shower compartment complete with shower mixer set and shower set
-One water closet
-One vanity cabinet complete with basin and mixer
-One mirror
-One towel rail
-One toilet paper holder
ii) Common Bathrooms (where applicable)
-One shower compartment complete with shower mixer and shower set
-One water closet
-One vanity cabinet complete with basin and mixer
-One mirror
-One towel rail
-One toilet paper holder
iii) WC (where applicable)
-One water closet
-One wash basin complete with tap
-One shower set
-One toilet paper holder
-One mirror
10. ELECTRICAL INSTALLATION
a) Electrical wiring below false ceiling within the units shall generally be concealed where possible. Electrical wiring above ceilings and main entrance corridor shall be in exposed trays and/or conduits and/or trunking
b) Type and number of lighting and power points refer to Electrical Schedule for details.
11. TV/CABLE SERVICES/TELEPHONE POINTS
Numbers of TV/Cable Services/Telephone points refer to Electrical Schedule.
12. LIGHTNING PROTECTION
Lightning Protection System shall be provided in accordance with Singapore Standard CP33 1996.
13. PAINTING
External Wall
-Spray Textured paint finish and /or emulsion paint to designated area
Internal Wall
-Emulsion paint finish
14. WATER PROOFING
Water proofing shall be provided to floor of Bathroom, Kitchen, WC, Balconies
15. DRIVEWAY AND CAR PARK
Surface driveways and drop off area
- Concrete/stone paver and/or tile and/or pre-mix and/or concrete floor and/or Grass-cell pavers
Basement Car park and ramp to Basement
- Reinforced concrete slab with hardener
16. LANDSCAPE/RECREATIONAL FACILITIES AND ELEMENTS
Basement 1
1) Guard House
2) Entrance Courtyard
3) Entrance Water Feature
4) Side Gate
5) Shared Bicycle Bay @ Basement
6) Managernent Office Basement First Storey
7) Children's Play Zone
8) Dining Deck
9) Barbeque Pavilion
10) Spice Garden
11) Outcbor Shower
12) Relaxing Corner
13) Wading And Fun Pool
14) Street Soccer Court (Non-standard)
15) Basketball Court (Half Court)
16) Butterfly Garden
17) Teppanyaki Pavilion
l8) Grill Pavilion
19) Sun Deck
20) Jacuzzi
21) Infinity Lap Pool (approx. 50m in length)
22) Communal Lounge
23) Reading Corner
24) Foot Reflexology Trail
25) Lush Landscape Garden
26) Changing Room
27) Seating Corner
Second Storey
28) Multi-Purpose Room
Fourteen Storey
29) Aerobic and Wellness Plaza
30) Outdoor Fitness Alcove
31) Indoor Gymnasium
32) Yoga Deck
33) TRX Exercise Corner
34) Aromatic Landscape Garden
Nineteen Storey
35) Leisure Deck
36) Reflective Pool
37) Putting Green
38) Cozy Corner with Swing Bench
39) Hammock Corner
40) Seating Above
41) Evergreen Landscape Garden
Twenty Nine Storey
42) Private Sky Lounge
43) Private Sky Dining
44) Private Sky Bar
45) Abloom Landscape Garden
17. ADDITIONAL ITEMS
a) Kitchen
- Built in kitchen cabinets with sold surface worktop complete with sink and mixer, cooker hooo and hob
- Built-in oven
- Built-in integrated fridge
b) Bedroom wardrobe
- Built in wardrobe with laminate/veneer/glass to Architects' design and specification
c) Air-Conditioning
- Wall mounted fan coil unit air-conditioning system to Living/Dining and Bedrooms to Engineer's design and specification
d) Water heater
- Hot water supply shall be provided to all Bathrooms and Kitchen
e) Security System
- Audio Intercom System to Units
- Security Card Access Control System to Lift, Gyms and Pedestrian Side Gates
- Carpark Barrier System at main entrance will be provided
- Closed Circuit Television System (CCTV) surveillance to 1st storey lift lobby and designated common areas
NOTE:
Marble/Compressed Marble/Limestone/Granite
Marble/compressed marble/limestone/granite is natural stone materials containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity in the marble/compressed marble/limestone/granite as well as non-uniformity between pieces cannot be totally avoided. Granite tiles are pre-polished before laying and care has been taken for their installation. However granite, being a much harder material than marble, cannot be re-polished after installation. Hence, some difference may be felt at the joints. Subject to clause 14.3, the tonality and pattern of the marble, limestone or granite selected and installed shall be subject to availability.
Timber-strips
Timber strips are natural materials containing veins and tonal differences. Thus, it is not possible to achieve total consistency of colour and grain in their selection and installation. Timber strips are also subject to thermal expansion and contraction beyond the control of builder and Vendor. Natural timber that is used outdoors will become bleached due to sunlight and rain. Thus, the cycle of maintenance on staining will need to be increased as required. Notwithstanding this note, the vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.
Air-Conditioning System
To ensure good working condition of the air-conditioning system, the system has to be maintained and cleaned on a regular basis by the Purchaser. This includes the cleaning of filters, clearing of condensate pipes and charging of gas. The Purchaser is advised to engage his/her own contractor to service the air-conditioning system regularly.
Television and/or Internet Access
The Purchaser is liable to pay annual fee, subscription fee and such other fees to the television and/or Internet service providers or any other relevant party or any relevant authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective channels and/or Internet access.
Materials, Fittings, Equipment, Finishes, Installations and Appliances
Subject to Clause 14.3, the brand, colour and model as specified for all materials, fittings, equipment, finishes, installations and appliances to be supplied shall be provided subject to Architect's selection and market avaibbility.
Layout/Location of Fan Coil Units, Electrical Points, Television Points, Telecommunication Points, Audio Intercom System, Door Swing Positions and Plaster Ceiling Boards.
Layout/Location of fan coil unit, electrical points,. television points, telecommunication Points, audio Intercom system, door swing positions and plaster ceiling boards are subject to Architect's final decision and design.
Warranties
Where warranties are given by the manufacturers and/or contractors and/or suppliers of any of the equipment and/or appliances installed by the Vendor at the Unit, the Vendor will assign to the Purchaser such warranties at the time when vacant possession of the Unit is delivered to the Purchaser. Notwithstanding this assignment, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.
False Ceiling
The false ceiling space provison allows for the optimal function and installation of M&E services. Access panels are allocated for ease to maintenance access to concealed M&E equipment for regular cleaning purposes. Where removal of equipment is needed, ceiling works will be required. Location of false ceiling is subject to the Architect's sole discretion and final design.
Glass
Glass is a manufactured material that is not 100% pure. Invisible nickel sulphide impurities may cause spontaneous glass breakage, which may occur in all glass by manufacturers. The Purchaser is recommended to take up home insurance covering glass breakage to cover this possible event. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.
Mechanical Ventilation System
Mechanical Ventilation fans and ducting are provided to toilets which are not naturally ventilated. To ensure good working condition of the mechanical ventilation system, the mechanical ventilation system for the exhaust system within internal toilets (where applicable) is to be maintained by the Purchaser on a regular basis.
Wall
All wall finishes shall be terminated at false ceiling level. There will be no tiles/stone works behind kitchen cabinets/vanity cabinet/mirror.