1. Foundation
Pile to engineer’s design
2. Superstructure
Reinforced concrete structure to engineer’s specification
3. Walls
a. External Walls : Reinforced concrete and /or common clay brick walls.
b. Internal Walls : Reinforced concrete and/or precast panels (light weight) and/or dry wall panels
4. Roof
Reinforced concrete flat roof
5. Ceiling
For Apartments
a. Living / Dining / Bedrooms / Study: Skim coat and/or ceiling board with emulsion paint finish.
b. Bathrooms and Kitchen: Skim coat and/or water resistant ceiling board with emulsion paint finish.
c. Household Shelter: Skim coat with emulsion paint finish
For Common Areas
d. Lift lobbies: Skim coat and/or ceiling board with emulsion paint finish
e. Carpark: Skim coat with emulsion paint finish
f. Staircases :Skim coat with emulsion paint finish
6. Finishes
Wall
a. Living / Dining / Bedrooms / Study/ Household Shelter: Plaster and/or skim coat with emulsion paint finish.
b. Master Bath / Common Bathrooms: Ceramic tiles and/or homogenous tiles finish
c. Balcony: plaster and/or skim coat with emulsion paint finish.
Note: No tiles/ stone behind mirrors and above false ceiling
Floor
d. Living / Dining: Marble / Compressed marble and/or ceramic tiles and/or homogenous tiles with timber and/or matching skirting finish.
e. Balcony: Ceramic tiles and/or homogenous tiles and/or stone tiles finish.
f. Kitchen: Marble / Compressed marble and/or ceramic tiles and/or homogenous tiles finish
g. Household Shelter: Ceramic tiles and/or homogenous tiles finish
h. Bathroom: Ceramic tiles and/or homogenous tiles and/or stone tiles finish
i. Bedrooms, Study: Random timber strips flooring and/or compressed marble and/or ceramic tiles and/or homogenous tiles with timber and/or matching skirting finish.
j. A/C Ledges: Cement screed.
7. Windows
Powder coated /natural anodized aluminium frame with plain float and/or tinted glass.
8. Doors
Fire rated solid veneer door for the main door complete with lockset. Steel door for house shelter as per requirement of authority.
9. Sanitary fittings
Master Bathroom
a. 1 shower bath with shower mixer, rain-shower head and shower set
b. 1 basin and mixer tap
c. 1 pedestal water closet
d. 1 mirror
e. 1 toilet paper holder
Common Bathroom
f. 1 shower bath with shower mixer and shower set
g. 1 basin and mixer tap
h. 1 pedestal water closet
i. 1 mirror
j. 1 toilet holder
10. Electrical Installation
All electrical wiring to be in concealed conduits and main in surface trunnking / pipes.
11. TV / Telephone
TV/ telephone points shall be provided in Living Room and Master Bedroom.
12. Lightning Protection
Lightning protection system shall be provided in accordance with the current edition of Singapore Code of Practice.
13. Painting
a. Internal wall: Emulsion water-based paint
b. External wall: Selected oil-based base coat and water-based exterior paint.
14. Water Proofing
Waterproofing to reinforced concrete flat roof and bathrooms (if any).
15. Driveway and Car Park
Concrete floor and/or ceramic and/or stone finish.
16. Recreation Facilities
The followings are provided:
a. Lap pool
b. Kid’s pool
c. Barbecue pit
17. Additional Items
a. Kitchen Cabinets
i. Kitchen cabinets with solid surface countertop complete with electric hob and cooker hood.
ii. One stainless steel sink complete with tap.
b. Refrigerator
c. Washer & Dryer
d. Wardrobes
i. Built-in wardrobes to all bedrooms (if any).
e. Air-conditioning
i. Split-unit air conditioner provided in living/dining, bedroom, study.
f. Water Heater
g. Railing
i. Mild steel for common stair railing
ii. Mild steel and/or glass for other railings.
h. Security
i. Audio intercom to all units: main door only.
i. Lift
i. passenger lift (‘Kone’ or equivalent) from basement to fifth floor.
j. Fencing
i. Brickwall and/or steel railing on brickwall and/or chain-link fencing.
SHOP SPECIFICATIONS
1. Structure
Reinforced concrete structure to engineer’s design
2. Walls
Clay brick and / or concrete blocks and / or dry / lightweight wall panels.
3. Ceiling
Skim coat to underside of slab / beam and /or fiber gypsum plasterboard and / or water resistance ceiling boards with emulsion paint finish.
4. Windows
Alumunium with glass.
5. Doors
Alumunium with glass / acrylic panels.
6. Flooring
a. Internal Area : Concrete finish
b. Common Area : Ceramic / homogeneous and / or stones for walkway, corridor, lobby.
7. Wall Finishes & Wall Tiles
a. Internal Area : Cement plaster with emulsion paint to ceiling height.
b. Common Area : Plaster with paint
c. Common Area : Ceramic / homogeneous tiles and / or plaster with paint for lobby
d. Common Area : Selected area with ceramic / homogeneous tiles and / or stones.
8. Sanitary Wares
Quality sanitary wares in toilets.
9. Sanitary Fittings
Quality sanitary fittings in toilets.
10. Electrical Installation
Electrical tap-off unit along corridor for individual unit. (Note : Purchaser to apply electrical meter to be installed in meter compartment. Tap-off power subject to MCST approval.)
Additional Items
11. Railing
Mild steel for common stair railing. Steel and / or glass for other railings.
12. Water Proofing
Water proofing to all reinforced concrete flat roof and toilets.
Note:
a. Stone:
Stone is a natural material containing veins with tonality differences. There will be colour and markings caused by their complex mineral composition and incorporated impurities. While such materials can be pre-selected before installation, this non-conformity cannot be totally avoided.
b. Timber:
Timber is a natural product that does not have total consistency of colour and grain. Thus it is not possible to achieve total consistency of colour and grain in their selection and installation.
c. Cable Television (SCV):
The purchaser is liable to pay annual fee, subscription fee and such other fees to Starhub Cable Vision (SCV) or any other relevant authorities. The vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective subscription channels.
d. Internet:
The purchaser is liable to pay Asymmetrical Digital Subscriber Line (ADSL) connection, annual fee, subscription fee and such other fees to Internet Service Provider (ISP). The vendor is not responsible to make arrangements with any said parties for the service connection for their respective subscription.
e. Air-conditioning:
Air-conditioning system has to be maintained and cleaned on a regular basis by the purchasers. This includes the cleaning of filters and condensation pipes to ensure good working condition of the system.
f. Wardrobe / Kitchen Cabinets / Mechanical Ventilation Units / Air-conditioning Fan Coil Units:
Layout / location of wardrobe / kitchen cabinets, mechanical ventilation units (if any) and air-conditioning fan coil units (if any) are subjected to architect’s sole discretion and final design.
g. Household Shelter:
The Household Shelter is designed for use as civil defence shelter. The walls, ceiling, floor and door of the Household Shelter shall not be hacked, drilled, altered or removed.