ACCESSIBILITY
• Within 5 to 10 minutes’ drive from National University of Singapore (NUS)
• 15 minutes’ drive from Central Business District, Clementi and Buona Vista MRT stations
• Bus no. 183 to Jurong East Interchange located conveniently in front if the building
• 5 minutes’ walk to bus stop with bus service nos. 10, 30, 51, 143, 188 & 200
• 10 minutes’ walk to Haw Par Villar MRT station
Shuttle Bus Services
• Conveniently located in front of Teletech Park
• Shuttle services to the following places are available in front of the building
- To Singapore Science Parks 1 and 2, NUS and Kent Ridge MRT station ($0.40 per trip)
- To Haw Par Villa MRT station ($0.40 per trip)
BUILDING SPECIFICATIONS
Type of Building
• 3-storey building with 2 inter-connecting blocks
Type of Premises
• IT unit:
Unit fitted with false ceiling, central air-conditioning, with/without raised flooring and lighting ideal for software development and IT set-ups
Floor Area
• Total NLA: Approx 16,056 sqm
Floor Loading
• Basement: 2.5 kN/sqm
• 1st storey: 12.5 kN/sqm for floor slab, 3.5 kN/sqm for raised floor panel
• 2nd and 3rd storey: 7.5 kN/sqm for floor slab, 3.5 kN/sqm for raised floor panel
• Roof Slab: 2.5 kN/sqm
Ceiling Height
• Raised floor to false ceiling
1st storey: 2.7 m
2nd & 3rd storey: 2.95 m
• Floor to false ceiling
1st storey: 2.85 m
2nd & 3rd storey: 3.1 m
• Floor to floor
1st, 2nd & 3rd storey: 4.5 m
Lifts
• Passenger lifts: 4 x 1,155 kg (17 persons)
• Cargo lifts: 2 x 3,000 kg
- Dimensions: 2.2 m (W) x 3.5 m (D) x 2.3 m (H)
- Lift car door size: 2.0 m (W) x 2.1 m (H)
Loading Bay Facilities
• 2 loading/unloading bays
Parking Lots
• Car: Approx. 224 (including surface lots)
• Parking lot allocation: 1 lot per 100 sqm leased
Air-conditioning System
• Central air-conditioning system
• Air-con providied from Mon to Fri (8am to 8pm) and on Sat (8am to 2pm) except Sun & Public Holidays
Power Supply Allocation
• Power supply of 22 KV with 2 incoming feeders
• Power provision of 60 amp 3-phase unmetered board is provided in the unit
• 1,000 KVA standby generator
Provisions
• Fibre-optic terminated at MDF
Amenities
• Cafeteria and childcare centre