Foundation
Reinforced concrete raft foundation
Superstructure
Reinforced concrete framed structure
Walls
External walls
- Reinforced concrete and/or common clay bricks
Internal Walls
- Reinforced concrete and/or Common clay bricks and/or concrete blockwall and/or dry wall partition
Roof
Reinforced concrete flat roof with waterproofing and Insulation system
Ceiling
- Fibrous plaster board ceiling to dining, kitchen, bathrooms and powder room - Cement sand plaster and paint finish to living, bedrooms and store
Finishes
(a) Well
(i) Internal walla
- Master Bathroom
Marble tiles to exposed surfaces up to underside of false ceiling
- Common Bathroom
Quality ceramic tiles to exposed surfaces up to underside of false ceiling
- Kitchen
Part quality ceramic tiles, part cement sand plaster and paint finish to exposed surfaces
- Powder Room
Quality ceramic tiles to exposed surfaces up to underside of false ceiling
- Lift Lobby
Lift entrance wall at easement and 1st Storey: Aluminium cladding Other walls:
Cement Sand plaster and paint finish
- Other Areas
Generally cement send plaster and paint finish
(ii) External walls
- Cement sand plaster and emulsion paint finish and/or cement sand plaster with spray-textured paint finish
(b) Floor (Limited to exposed areas only)
- Living/Dining
Marble tiles with timber skirting (Type A3 and D1 only)
Timber strip flooring system with timber skirting (All units except Type A3 and 01)
- Bedrooms
Timber strip flooring system - Master Bathroom Marble tiles
- Common Bathroom
Quality ceramic tiles
- Kitchen
Quality ceramic tiles
- Powder Room Quality ceramic tiles
- Lift lobby
Granite tiles
- PES / Roof Terrace
Pre-cast pebble wash slab (1st Storey)
Timber decking (8th Storey)
- Roof / Pool Deck
Granite tiles and pebble stones (limited to public areas only)
- Internal Staircase
Timber flooring (Type D2 only)
- Staircases
Granite tiles and/or cement sand screed with epoxy coating
Windows
Curtain wall
- Fluorocarbon-Coated/powder-coated aluminium frame sections with laminated glass
- Fluorocarbon-coated/powder-coated aluminium frame operable panels with laminated glass Windows
Doors
Main Entrance
- Half hour fire-ratedtimbor door with timber veneer finish
Internal
Timber flush door with timber-veneer finish
- Timber flush door with infil glazed panel-between dining area and kitchen {Type D2 only)
- Good quality ironmongery
Sanitary Fittings
Master Bathroom
- 1 vanity wash-basin; 1 long bath (except Type B1) shower screen to shower enclosure.(TYpe B1 only) ; 1 water closet; 1 toilet roll holder: 1 towel rail Common Bathroom
- 1 vanity wash-basin; 1 water closet, 1 shower screen to shower enclosure; 1 toilet roll holder: 1 soap tray; 1 towel rail
Powder Room
- 1 wash-basin; 1 water closet; 1 toilet roll holder Kitchen
- Good quality stainless steel sink
Electrical Installation
Concealed electrical wiring In conduits below false ceiling. Electrical wiring above ceiling in exposed conduits.
SCHEDULE OF LIGHTING & POWER POINT PROVISION
Lightning Protection
Lightning protection system in compliance with Singapore Standard CP33 (1996)
Painting
-Internal: emulsion paint
- External: spray-textured coating system and/or emulsion paint
Waterproofing
To bathrooms, kitchen. powder room. PES. roof terraces and reinforced concrete flat roof
Driveway and Car Park
- Stone paving to designated areas of driveway on 1st Storey
- Cement send screed with hardener to basement carpark
Recreation Facilities
- Roof top swimming pool (7th Storey)
- Roof top garden and 880 pit